Exteriors of the Boulder Dam Service Bureau and Boulder City Theatre covered with snow. Snow-covered automobiles are parked on Arizona Street, and the Boulder Dam Hotel and the Union Bus Terminal can be seen in the distance.
A view of Grover Whalen, Howard Hughes, and Al Lodwick riding in the back of an automobile during a parade procession. Description printed on photograph's accompanying sheet of paper: "Howard Hughes (center), Grover Whalen (Left) and Albert Lodwick during the New York reception for Hughes after completing his round-the-world flight. 7/15/38."
The black and white view of several unidentified people and mechanics surrounding the Lockheed 14 aircraft for Howard Hughes' Around the World flight. Description printed on photograph's accompanying sheet of paper: "Ground crew refueling Lockheed 14. Crowd and hangar in background."
The black and white view of the Lockheed 14 aircraft taking off on a part of Howard Hughes' Around the World flight. Description printed on photograph's accompanying sheet of paper: "Howard Hughes take-off at 9:36 p.m. after 1 hr., 18 min. Fairbanks, Alaska."
The black and white view of the Lockheed 14 aircraft preparing for a part of Howard Hughes' Around the World flight. Description printed on photograph's accompanying sheet of paper: "Howard Hughes world flight plane in S. Paul, Minn., for 33-minute stop before last leg of flight back to New York."
From the Sister Klaryta Antoszewska Photograph Collection (PH-00352). The presentation slide reads, "Nevada Operations office off-site follow-up studies project scope. Collect & organize historical documents. Publish/make available previously unreleased or classified data. Make comprehensive assessment of radiation dose. Compile operating on/off site for each event."
From the Sister Klaryta Antoszewska Photograph Collection (PH-00352). The presentation slide reads, "Total announced tests and radiation measured off the test range complex. Total above-ground tests = 126. Total sub0surface tests = 413. Total tests = 539. Number measured off the test range complex of above-ground tests = 89. Number measured off the test range complex of sub-surface tests = 40. Total number measured off the test range complex = 129."