Skip to main content

Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 46781 - 46790 of 47615

Interview with Layton James O'Neill, July 23, 2004

Date

2004-07-23

Description

Narrator affiliation: Health Physicist, U.S. Atomic Energy Commission; Department of Energy

Text

Holocaust Education Conference program, 1997

Date

1997

Archival Collection

Description

Booklet program from the Holocaust Education Conference, 1997.

Text

Application and supporting documents for the naming of Mark L. Fine Elementary School, 2007

Date

2007

Archival Collection

Description

The application and supporting documents provide details about Mark Fine and his contributions to Clark County and Las Vegas, Nevada. There are letters of support from many members of the community, including his children and elected officials, and from leaders in religious groups, non-profit organizations and business enterprises.

Text

Eric Brown (Washoe, County Manager) oral history interview conducted by Kelliann Beavers: transcript

Date

2022-07-14

Description

From the Lincy Institute "Perspectives from the COVID-19 Pandemic" Oral History Project (MS-01178) -- Government agency interviews file.

Text

Film strip of individuals or Hoover Dam construction, image 006: photographic print

Date

1930 (year approximate) to 1939 (year approximate)

Description

This photograph has three images. The first one (0272_0040) reads, "Early morning on grave-yard shift, day shift coming on, notice lunch boxes. Hardway Johnnie (John Armitage) the graveyard Asst. Super. Coming down to see why they are slow getting to their jobs - that's me right behind him." "The men nicknamed me Hardway Jr. I relayed his orders. He had a hard time walking those 2x12 boards on top of the forms - they did install rails later, as you can see, but didn't weather the rough treatment - (xx) elevator shaft." "I got a lot of learning under John Armitage. He sent me to relieve on so many different jobs. Had clean up crew for three months - also I ran the pours with #5 hi-line until it could reach the dam no more, with the angle it sat. Tied steel on intake towers two nights." "Most fearful job was relief hook tender on the stiffleg. The job was situated on a pad on the upstream face of the dam, about level with the low-mix trusel, with just enough room for two of the 8 yd. buckets - the stiffleg would leave a bucket of mud - pick an empty one - No.6 hi-line would leave and empty one and pick up the empty. The men stood as flat as they could - during the exchange with the bucket down. The men would grab the swinging steel cables in one hand, the 12 pound hook that felt like 50 pounds. Place cable on eye in bucket, then twist hook down and slam in place - no guard rails." The second one (0272_0041) reads "Intake towers growing. The bottom of the picture shows a finished pour - it must cure for 12 hours in the hot weather, and 48 hours, cold weather - 300 ft. down if you step off the end of this panel (see arrow)," as a handwritten inscription. The third one (0272_0042) reads "The morning after my first night of work, with Dickey" (dog).

Image

neo000139-004

Description

Sign animation: Chasing, flashing, oscillating
Notes: The logo cabinets which adorn the entrances on the elevated walkways: The letters start with both rows of text in the off position. The top row flashes on, while the bottom row is dark then the bottom row illuminates, as the top row goes dark. Once the top row flashes off it flashes back on so that both rows of text are briefly illuminated simultaneously before they both go dark and the sequence stars over again. While this is going on the incandescent bulbs which line all of the raceways are chasing each other from left to right on the horizontal planes, while the arched sections chase each other downward. The triangular peaks which radiate around the top of the logo sign, flash on and off in a sequence which chase each other downward. First the top center peak flashes on, then the next sequential triangular channel on both sides illuminate simultaneously, flash off, then the next two in the series illuminate. The resultant effect is a chasing pattern starting from the top. The sister animation is located on almost the exact same design on the porte cochere. I would think the previous smaller sign would be based on the larger porte cochere. The other variance besides obvious size difference is the that the channel letters are filled with incandescent bulbs instead of neon. The animation is a bit simpler as well. The incandescent bulbs oscillate continuously while the triangular pan channels which create the radiating crown, animate. The neon in the channels chase each other as described in the smaller walk way version, while the text continues until the entire text flashes off, then on, off, then begin to animate once again. All of the bulbs, which line the raceways of the exterior edge of the porte cochere, as well as the encrustation of bulbs on the brass bull nose portion, animate in rapid succession. All the raceway bulbs chase each other while the bulbs on the brass portion continually oscillate. Animation continues on the east face of the building with the entrances first. The principle for these two signs is oscillation and chasing. All bulbs on the underside of the entrance, as well as in the logo, oscillate rapidly. All bulbs on the raceways chase each other. Further on the surface of the building as well, the Pepsi cola wall sign is found displaying a very unique form of animation, seen here on the strip. The signage for the Pepsi ad is located on the eastern wall. (Detailed in specific description) The Incandescent bulbs which fill the inside of the text that spells Pepsi, chase each other from left to right, leaving all the bulbs in its path illuminated, as if writing out the word Pepsi. The neon bars located within the tilted bottle of Pepsi are illuminated, and chase each other downward, leaving the bars it its path dark. As this sequence in taking place, the waving tubes of neon illuminate, flashed subtly making the neon appear as soda pouring out of the bottle. As the tubing flows then the vertical neon bars in the cup illuminate one at a time making the cup appear as if it is filling up. The text above each of the painted fires head, flashes back and forth as if talking to each other as well. ESPN ZONE animation: The letters in the vertical blade portion of the ESPN Zone illuminate one at a time, starting from the top. Once the entire phrase is lit, in flashes off then on then off, before restating. The orange and red neon tubing which resides inside the pan channels that represent flames flash on and off in a relaxed manner as if to animate the flickering of the flames. The small incandescent bulbs on the black portions above the main matrix reader board flash on and off subtly.
Sign keywords: Neon; Backlit

Allied Arts Council of Southern Nevada Records

Identifier

MS-00187

Abstract

The Allied Arts Council of Southern Nevada (AACSN) Records are comprised of the organizational records of the Allied Arts Council, a Las Vegas, Nevada-based non-profit organization that promoted the arts and cultural life in Southern Nevada from 1971 to 1999. Materials include meeting minutes, financial records, correspondence, membership information, publications, event information, project files, photographs, audio cassettes, VHS, and U-Matic tapes.

Archival Collection