Skip to main content

Search the Special Collections and Archives Portal

Search Results

Displaying results 2141 - 2150 of 2164

Architectural drawing of a cabin to be built for the Union Pacific System at Cedar Breaks, Utah, plan, elevations, section, details, details of bed and dresser, June 10, 1924

Date

1924-06-10

Description

Plan, elevations, section and details of a cabin at Cedar Breaks Natinal Monument, Utah; includes details for bed and dresser. "Dr. by MB; Tr. by MB." "Sheet #1, Job #297. 6-10-24."
Site Name: Cedar Breaks National Monument (Utah)

Image

Architectural drawing of a pavilion for the Union Pacific System, Cedar Breaks, Utah, roof plan and details, May 30, 1924

Date

1924-05-30

Description

Roof plan and details for pavilion at Cedar Breaks National Monument, Utah. "As constructed, W.O. 4878A. 15706E. Sheet #5, Job #256. 5-30-24." "Scale 1/4" = 1'0'."
Site Name: Cedar Breaks National Monument (Utah)

Image

Architectural drawing of a pavilion for the Union Pacific System, Cedar Breaks, Utah,truss details, June 24, 1926

Date

1926-06-24

Description

Truss details for pavilion at Cedar Breaks National Monument, Utah. "Dr., tr., ch. by P. R. Gage. Sheet No. 6, Job No. 256. Scale 1"=1'0."
Site Name: Cedar Breaks National Monument (Utah)

Image

Architectural drawing of additions and alterations to the mens' and womens' health clubs in the Sands Hotel, Las Vegas, Nevada, April 19, 1965

Date

1965-02-25

Description

Floor plans, sections, elevations for mens' and womens' health clubs at the Sands Hotel, Las Vegas, Nevada. Includes door and finish schedules. "Sheet no. 17A. Job no. 420. Drawn by Shoji Yasuda. Job captain, Mas Tokubo. 2-26-65. Revised 4-19-65."
Site Name: Sands Hotel
Address: 3355 Las Vegas Boulevard South;

Latest Drawing Revision: 1965-04-19

Image

Architectural drawing of additions and alterations to the second floor of the Sands Hotel, Las Vegas, Nevada, August 23, 1965

Date

1964-08-03

Description

Additions and alterations to the second floor of the Sands Hotel, Las Vegas, Nevada. "Sheet no. 20. Job 420. Job captain, M. Tokubo. Scale 1/8"=1'-0." August 3, 1964. Revised 8-14-64, 8-23-65."
Site Name: Sands Hotel
Address: 3355 Las Vegas Boulevard South;

Latest Drawing Revision: 1965-08-23

Image

Architectural drawing of additions and alterations to first floor air conditioning piping in the Sands Hotel, Las Vegas, Nevada, November 4, 1965

Date

1964-08-03

Description

Additions and alterations to first floor air conditioning and piping in the Sands Hotel, Las Vegas, Nevada. Includes details of dishwasher piping and humidifier piping, and equipment notes. "Sheet number M2. Job number 420. Job captain, D.G. Checked by D.G. Consultant: Hellman & Lober, Mechanical Engineers." "August 3, 1964. Revised 8-14-64, 11-4-65."
Site Name: Sands Hotel
Address: 3355 Las Vegas Boulevard South;

Latest Drawing Revision: 1965-11-04

Image

Architectural drawing of additions and alterations to second floor and tower air conditioning piping in the Sands Hotel, Las Vegas, Nevada, August 14, 1964

Date

1964-08-14

Description

Additions and alterations to second floor and tower air conditioning piping in the Sands Hotel, Las Vegas, Nevada. Sheet number M3. Job no. 420. Job captain, D.G. Drawn by D.G. Scale 1/16"=1'0." Revised 8/14/64." Consultant: Hellman & Lober, Mechanical Engineers.
Site Name: Sands Hotel
Address: 3355 Las Vegas Boulevard South;

Image

Architectural drawing of partial additions and alterations to first floor air conditioning in the Sands Hotel, Las Vegas, Nevada, August 13, 1965

Date

1964-08-03

Description

Partial plan of additions and alternations to the air conditioning system on the first floor of the Sands Hotel, Las Vegas, Nevada."Sheet number M6. Job 420. Scale: 1/8"=1'0. Drawn by KKSH. Job captain: D.G. Checked by D.G. Date: 8-3-1964. Revisions 8/14/64; 8/31/64; 11/6/64; 1/12/65; 3/12/65; 4/12/65; 8/13/65. Consultant: Hellman & Lober, Mechanical Engineers."
Site Name: Sands Hotel
Address: 3355 Las Vegas Boulevard South;

Latest Drawing Revision: 1965-08-13

Image

Architectural drawing of partial additions and alterations to second floor air conditioning in the Sands Hotel, Las Vegas, Nevada, August 31, 1964

Date

1964-08-03

Description

Partial plan of additions and alternations to the air conditioning system on the second floor of the Sands Hotel, Las Vegas, Nevada"Sheet number M7. Job 420. Scale: 1/8"=1'0. Job captain: D.G. Checked by D.G. Date: 8-3-1964. Revisions 8/31/64. Consultant: Hellman & Lober, Mechanical Engineers."
Site Name: Sands Hotel
Address: 3355 Las Vegas Boulevard South;

Latest Drawing Revision: 1964-08-31

Image

Architectural drawing of additions and alterations to air conditioning on typical tower floor in the Sands Hotel, Las Vegas, Nevada, May 7, 1965

Date

1964-08-03

Description

Plan of additions and alterations to a typical tower floor of the Sands Hotel, Las Vegas, Nevada. "Sheet number M10. Job 420. Scale: 1/4"=1'0. Drawn by KKSH. Job captain: D.G. Checked by D.G. Date: 8-3-1964. Revisions 8/14/64; 3/19/65; 5/7/65. Consultant: Hellman & Lober, Mechanical Engineers."
Site Name: Sands Hotel
Address: 3355 Las Vegas Boulevard South;

Latest Drawing Revision: 1965-05-07

Image