View of canyon wall and beginning of diversion tunnel. Note on back: "Not taken by W. A. Davis. Photo probably taken by Frank, Six Co's. photographer; photo shows Nevada side. - W. A. Davis, 1992."
View looking out of diversion tunnel, diameter 56' or more, inside finish 50'. Note on back: "Tunel is on Nevada side. Tunnels had compressed air lines and electricity installed Marion electric steam shovel. - W. A. Davis, 1992."
Constructing of diversion tunnels, upstream end. Setting up frames for trash racks. Note on back: "Upstream end of the diversion tunnel on Nevada side, probably No. 1 tunnel. - W. A. Davis, 1992."
Diversion Tunnel No. 3 nearly completed. Sept. 1, 1932. "Asphalt visible on ceiling. Fill on Floor & rails have to be removed prior to use for water diversion. Tunnel is completed except for fill removal." W.A. Davis, 1992
Mule on road to where power substation was being built, Hoover (Boulder) Dam. Note: "It took all day to get from boat launch to power substation. Took your lunch and a canteen. This spot is beside Hemenway Wash. - W. A. Davis, 1992."
Building site of sub station. Air compressor on right; tripod w/large jackhammer, upper left, to drill holes. Note on back: "Air compressor used on railroad grade by Lewis Construction."