View of the control room in mixing plant where all concrete is mixed for diversion tunnels. A complete record is made by graph of each batch of concrete mixed. ""Scales for meadsuring mixing components. - W.A. Davis.""
Railroad materials on road, Fortification Hill in background. Truck-Nevada Transportation Co., owned by Shorty Griffith. Note on back: "Truck delivered dynamite and blasting powder. Looking south toward Hemenway Wash. Fortification Hill is behind photographer to the right side. Unloaded boxes of powder to the right. - W.A. Davis."
Aerial photo looking upstream before coffer dam was started; diversion tunnels cut and suspension foot bridge completed. Lower catwalk was four feet wide for personnel traffic only. 600 ft. ladder at end went up canyon wall in 40 ft. sections. "First bridge built in the lower canyon. - W.A. Davis, 1992"
Blasting rock upstream of Dam site. Note suspension foot bridge and larger, small truck bridge. Note on back: "Two men were blown up at this spot the day Wint took this photo - James J. Hester, son-in-law of W. A. 'Wint' Davis."