Plans for the reception and telephone areas and air conditioning building for the Hacienda from 1963-1965 plans. Includes air conditioning chart and light fixture schedule. Site Name: Hacienda Address: 3590 Las Vegas Boulevard South
Plans for kitchen alterations for the 1968 Hacienda remodel. J. L. Cusick and Associates, electrical engineers; Harold L. Epstein and Associates, structural engineers; W. L. Donley and Associates, mechanical engineers. Site Name: Hacienda Address: 3590 Las Vegas Boulevard South
Entryway floor plan for the dining and banquet rooms of the 214 room addition to the Hacienda. Sage and Sable Enterprises, Inc., project owners. Site Name: Hacienda Address: 3590 Las Vegas Boulevard South, Las Vegas, NV
Col. Frederick Green (left) and Maj. Gen. James A. Knight, Jr. (center), accepts plaques from Harold Archer (right), Associate Executive Director of United Way of Southern Nevada. Site Name: Nellis Air Force Base (Nev.)
Change of command ceremony outside of U.S. Air Force Tactical Fighter Weapons Center (later U.S. Air Force Warfare Center) building, Nellis Air Force Base, Nevada. Site Name: Nellis Air Force Base (Nev.)
Signs advertising the Ascaya luxury home development sit on a large lot off Epic View Court prior to homes being built. Infrastructure for Ascaya, carved into the McCullough Mountain range in Henderson, Nevada, was completed with materials mined from the site.
Signs advertising the Ascaya luxury home development sit on a large lot off Epic View Court prior to homes being built. Infrastructure for Ascaya, carved into the McCullough Mountain range in Henderson, Nevada, was completed with materials mined from the site.
Photographer's notes: "Upstream evening view of the bridge with piers near completion and twelve tub girders installed on the arch's center, from the boat launch area, February 3, 2010." Site Name: Mike O'Callaghan-Pat Tillman Memorial Bridge
Photographer's notes: "View up to the Nevada side from the Arizona side of the powerhouse with birds and jet, awaiting installation of the final four tub girders, April 15, 2010." Site Name: Mike O'Callaghan-Pat Tillman Memorial Bridge
Photographer's notes: "The final tub girder of the bridge's construction appears to be moving into position for installation, but it is really being brought into position for a photo opportunity by the ironworkers, April 15, 2010." Site Name: Mike O'Callaghan-Pat Tillman Memorial Bridge