Skip to main content

Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 706581 - 706590 of 722953

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1972-08-07

Description

Pg.38 #2720 Form work in Units 8 and 9, Arizona Power House. June 14th, 1934. Pg.38 #2733 Nevada Power House layout. June 21st, 1934. Pg.38 #2730 Night photograph of Power House construction. June 19th, 1934. Pg.38 #2732 Arizona Power House layout. June 21st, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1973-01-03

Description

Pg.18 #2528 Forms for transition at the Downstream Plug of Diversion Tunnel No. 2. Jan. 27th, 1934. Pg.18 #2507 Nevada Spillway Weir section. Jan. 24th, 1934. Pg.18 #2506 Nevada Spillway, looking upstream. Jan. 24th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1973-02-06

Description

Pg.97 #3512 Looking upstream in Arizona Valve House. Note three gates and needle valves have been installed. Oct. 29, 1935. Pg.97 #3497 View from top of Boulder Dam, looking toward Power House, Valve Houses and lower portals of Diversion Tunnels. Oct. 28, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1974-09-26

Description

Pg.16 #2468 Upstream face of Boulder Dam. Dec. 27th, 1933. Pg.16 #2474 Downstream face of Boulder Dam. Dec. 27th, 1933. Pg.16 #2466 Boulder Dam. View taken looking upstream. Dec. 27th, 1933.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1975-03-22

Description

Pg.21 #2541 General view of Nevada Intake Towers from Arizona side, showing Lomix trestle below. Feb. 20th, 1934. Pg.21 #2540 General view of Nevada Intake Towers and Spillway from Nevada Himix Trestle. Feb. 20th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1975-09-17

Description

Pg.31 #2666 Looking upstream in Black Canyon, showing the downstream face of Boulder Dam. April 30th, 1934. Pg.31 #2659 View showing installation of 100-ft. Drum Gates in the Arizona spillway. April 28th, 1934. Pg.31 #2664 Looking upstream in No. 5 Penstock tunnel, showing penstock outlets, manways and pedestal recesses. April 28th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1976-09-11

Description

Pg.42 #2774 View showing river side of Arizona Spillway, looking downstream. July 24th, 1934. Pg.42 #2761 Looking upstream toward the Nevada Spillway, showing the placing of the Cylinder Gates. July 20th, 1934. Pg.42 #2758 First 30-ft. penstock pipe section being lifted from trailer with Government Cableway. July 20th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1976-09-23

Description

Pg.47 #2860 Looking downstream into the Arizona Spillway. Sept. 27th, 1934. Pg.47 #2861 Looking downstream into the port of No.4 raise. Sept. 27, 1934. Pg.47 #2865 Looking from the Arizona side, toward the Nevada side, showing all four Intake Towers, three derricks, Boulder Dam to the left, and the Nevada Spillway to the right. Sept. 27th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1977-01-20

Description

Pg.50 #2843 View taken from the Nevada side, looking downstream on the lower coffer dam, showing excavation and dykes. Sept. 17th, 1934. Pg.50 #2862 Looking downstream toward the upstream face of Boulder Dam, from the Arizona side. Sept. 27th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1977-05-12

Description

Pg.56 #2934 Looking upstream in No.1 plug, showing the united portions of the arch and raise into the Nevada Spillway. Nov. 17th, 1934. Pg.56 #2935 Looking upstream into No.3 plug and raise, showing plug concrete in place, cooling headers above and rail extension for moving steel pipe. Nov. 17th, 1934.