Skip to main content

Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 589871 - 589880 of 636978

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-02-08

Description

Pg.73 #3238 Telephoto view of the Arizona Valve House. Apr. 25, 1935. Pg.73 #3234 A telephoto view from the Nevada side, showing some of the Arizona power House roof girders in position. Note the Universal Crane on top. The girder on the flat car has just been lowered by means of the Government Cableway. Apr. 25, 1935. Pg.73 #3237 Telephoto of the Nevada Valve House. Note the forms for the roof beams being built. Apr. 25, 1935. Pg.73 #3245 View taken from the upstream end of No.4 Plug, looking downstream, showing the method of pouring. Apr. 26, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-06-23

Description

Pg.76 #3269 Boulder Dam, looking downstream from the Arizona side. May 27, 1935. Pg.76 #3284 Looking in a general downstream direction, on the Arizona Black Canyon Highway, showing Six Companies Inc. road work. May 27, 1935. Pg.76 #3296 Boulder Dam, looking downstream from the Nevada side, showing Spillways and the Intake Towers. June 1, 1935. Pg.76 #3303 View of the open cut portion of the Switchyard Control Circuit Tunnel. Shovel is excavating for the Switchyard, and the building in the foreground is the power sub-station. The Babcock and Wilcox Company plant can be seen in the extreme background. June 1, 1935.