Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1971-08-03

Description

p.18 #1131 Detail picture of side-wall "jumbo" used in placing 3ft. thick lining in diversion tunnels. Side wings are jacked into place, and concrete is poured thru ports by a traveling crane and 2yd. buckets. Apr. 18, 1932. p.18 #1202 First "jumbo" for pouring concrete lining in top or arch section of tunnels was erected on "beach" in front of tunnel No.2 and transported across river in sections by cableway. May 20, 1932. p.18 #1132 This view and No.1131 show forms set for first side-wall pour in upper portal of tunnel No.3. Form is 80 feet long and consists of four 20ft. sections bolted together. Note size of man in upper right. Apr. 29, 1932.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1971-09-20

Description

p.21 #1506 Blast on Cableway bench excavation, on Arizona side, above dam site. Picture taken from lower portal of Railroad Tunnel No.1. Aug. 24, 1932. p.21 #1457 Picture of blast at same place shown above, taken from opposite, on Black Canyon Highway. Aug. 16, 1932. p.21 #1507 Huge billows of rock and dust pour over canyon rim and descend to river below. Aug. 24, 1932. p.21 #1456 Blast on Arizona intake tower excavation, which has filled canyon with smoke and dust. Upper steel suspension bridge shown in background. Aug. 16, 1932.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1972-07-15

Description

Pg.93 #3467 Looking downstream from Nevada side, showing Boulder Dam, Spillways, Intake Towers, etc. Note general clean-up and road work; also, Intake Tower lanterns in place. Sept. 27, 1935. Pg.93 #3471 Looking upstream toward Nevada Spillway Drainage Flume, and general area. Sept. 27, 1935. Pg.93 #3464 Looking downstream toward Arizona Spillway. Note general road work, curbs in place and guard rails being installed. Sept. 26, 1935. Pg.93 #3465 From Arizona Spillway Gate House, looking upstream. Note float well supply line finished and construction on upstream abutment wall. Sept. 9, 1935

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1975-09-09

Description

Pg.30 #2638 Interior view of Poser House block A-7, showing reinforcing steel and pipe layout. April 25th, 1934. Pg.30 #2634 View of Poser House block No. A-7, from the lower Arizona construction unit, showing form work and pouring arrangement. April 25th, 1934. Pg.30 #2660 Looking upstream in Black Canyon, showing general view of the Power House layout, taken from the Nevada Valve House bench. April 28th, 1934. Pg.30 #2629 General view of Himix and Cement Blending Plants, with unloading track and aggregate bins above. April 17th, 1934.