Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1971-07-01

Description

p.5 #948 Foundations for the trash rack structure being installed in front of upper portal of Diversion Tunnel no.2. This is where the first pay concrete was poured. Mar. 7, 1932. p.5 #943 View of gravel plant, showing live storage of screened aggregate and sand in foreground. Storage pile for raw aggregate in background. Mar. 2, 1932. p.5 #951 Upper portals of Diversion Tunnels No.1 and 2. Note workmen scaling above portal of Diversion tunnel No.1. Mar. 7, 1932. p.5 #937 Night view of gravel plant, taken near first scalping screen, and looking in opposite direction than the view on left. Feb. 26, 1932.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1971-07-01

Description

p.7 #969 First-aid station and ambulance located at river camp above upper portals. Similar hospital is maintained at lower portals. Mar, 8, 1932. p.7 #918 Interior of one of many drill sharpening stations, showing forge and Ingersoll-Rand drill sharpener. Feb. 15, 1932. p.7 #974 Caterpillar 60 with bull-dozer in front and cow-dozer aft, used extensively for moving muck. Mar. 8, 1932. p.7 #946 Two levels of highway which will cross top of the dam. Note the rubble stone masonry retaining wall. High-level concrete mixing plant will be located in the draw in foreground. Mar. 2, 1932.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1971-08-03

Description

Pg.12 #2437 Upper Portals of the Diversion Tunnels. The dyke being built is at Elevation 690, which was the elevation of the top of the Tunnels. Nov. 30th, 1933. Pg.12 #2438 Close-up of Boulder Dam. The top blocks are at Elevation 715. Nov. 30th, 1933. Pg.12 #2444 Himix Plant. Note the new type of 8 cu. yd. bucket on the car, and the two additional 4 cu. yd. Mixers being installed. De. 1st, 1933. Pg.12 #2446 Arizona Intake Towers. The head tower for No. 10 Cableway is erected and the 180 ft. boom derrick is nearly complete. Dec. 1st, 1933

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1971-08-03

Description

p.18 #1131 Detail picture of side-wall "jumbo" used in placing 3ft. thick lining in diversion tunnels. Side wings are jacked into place, and concrete is poured thru ports by a traveling crane and 2yd. buckets. Apr. 18, 1932. p.18 #1202 First "jumbo" for pouring concrete lining in top or arch section of tunnels was erected on "beach" in front of tunnel No.2 and transported across river in sections by cableway. May 20, 1932. p.18 #1132 This view and No.1131 show forms set for first side-wall pour in upper portal of tunnel No.3. Form is 80 feet long and consists of four 20ft. sections bolted together. Note size of man in upper right. Apr. 29, 1932.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1971-09-20

Description

p.21 #1506 Blast on Cableway bench excavation, on Arizona side, above dam site. Picture taken from lower portal of Railroad Tunnel No.1. Aug. 24, 1932. p.21 #1457 Picture of blast at same place shown above, taken from opposite, on Black Canyon Highway. Aug. 16, 1932. p.21 #1507 Huge billows of rock and dust pour over canyon rim and descend to river below. Aug. 24, 1932. p.21 #1456 Blast on Arizona intake tower excavation, which has filled canyon with smoke and dust. Upper steel suspension bridge shown in background. Aug. 16, 1932.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1972-07-15

Description

Pg.93 #3467 Looking downstream from Nevada side, showing Boulder Dam, Spillways, Intake Towers, etc. Note general clean-up and road work; also, Intake Tower lanterns in place. Sept. 27, 1935. Pg.93 #3471 Looking upstream toward Nevada Spillway Drainage Flume, and general area. Sept. 27, 1935. Pg.93 #3464 Looking downstream toward Arizona Spillway. Note general road work, curbs in place and guard rails being installed. Sept. 26, 1935. Pg.93 #3465 From Arizona Spillway Gate House, looking upstream. Note float well supply line finished and construction on upstream abutment wall. Sept. 9, 1935

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1975-09-09

Description

Pg.30 #2638 Interior view of Poser House block A-7, showing reinforcing steel and pipe layout. April 25th, 1934. Pg.30 #2634 View of Poser House block No. A-7, from the lower Arizona construction unit, showing form work and pouring arrangement. April 25th, 1934. Pg.30 #2660 Looking upstream in Black Canyon, showing general view of the Power House layout, taken from the Nevada Valve House bench. April 28th, 1934. Pg.30 #2629 General view of Himix and Cement Blending Plants, with unloading track and aggregate bins above. April 17th, 1934.