Skip to main content

Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 602291 - 602300 of 613607

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1973-08-23

Description

Pg.95 #3553 View from the crest of Boulder Dam, looking downstream toward the Power House and lower portals of Diversion tunnels. Nov. 26, 1935. Pg.95 #3527 Boulder Dam and Power House, looking upstream from Nevada side. Note reservoir and Fortification Hill in background. Nov. 23, 1935. Pg.95 #3545 View from reservoir, looking downstream at Boulder Dam and Intake Towers. Nov. 26, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1973-11-02

Description

Pg.96 #3549 Looking south toward Boulder Dam Switchyard, showing construction and excavation. Nov. 26, 1935. Pg.96 #3531 Looking upstream in lower No.3 Plug. Note one of pipe sections in place. Nov. 25, 1935. Pg.96 #3551 Looking upstream along Nevada approach to Boulder Dam. Note rubble wall being built and excavation for tower footings. Nov. 26, 1935. Pg.96 #3534 Looking upstream in lower No.2 plug, showing pipe in place. Nov 25, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1975-01-22

Description

Pg.5 #2336 150-Ton Government Cableway, completed and in operation. Aug. 19th, 1933. Pg.5 #2326 Blending Plant, recently placed in operation, at the Himix Concrete Plant. Aug. 19th, 1933. Pg.5 #2349 Hoover Dam, Cooling Tower and Refrigeration Plant, looking downstream. Sept. 14th, 1933. Pg.5 #2358 Nevada spillway weir, showing forms for downstream abutment. Sept. 15th, 1933.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1975-01-24

Description

Pg.19 #2521 Forms in the upstream plug of Diversion Tunnel No. 2. Jan 27th, 1934. Pg.19 #2522 Forms in the upstream plug of Diversion Tunnel No. 3. Jan 27th, 1934. Pg.19 #2525 Placing concrete lining in Arizona upper penstock tunnel. Jan. 27th, 1934. Pg.19 #2524 Placing concrete lining in Arizona upper penstock tunnel. January 27th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1976-04-12

Description

Pg.33 #2667 - Pg.33 #2668 Panorama looking downstream in Black Canyon, taken from the Nevada side, showing the upstream face of Boulder Dam, Arizona and Nevada Spillways, Intake Towers, Cableways and general construction. May 12th, 1934. Pg.33 #2697 Arizona Spillway, looking upstream. May 25th, 1934. Pg.33 #2695 Trash rack at the upper portals of Diversion Tunnel No. 2. May 25th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1976-06-09

Description

Pg.35 #2703 Nevada Power House, from the Arizona Valve House bench. May 29th, 1934. Pg.35 #2701 Boulder Dam and Power House, looking upstream from the Downstream Cofferdam. May 29th, 1934. Pg.35 #2702 Arizona Power House, from the Nevada Valve House bench. May 29th, 1934. Pg.35 #2704 No. 5 unit of Nevada Power House, showing No. 3 pour completed. May 29th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1976-07-01

Description

Pg.39 #2715 Second millionth yard being placed in Boulder Dam. June 2nd 1934. Pg.39 #2741 View of the Drum Gates in the Arizona Spillway. June 21st, 1934. Pg.39 #2744 Top of Boulder Dam, from the Nevada side. Arizona Intake Towers in Background. June 22nd, 1934. Pg.39 #2742 View of Nevada Spillway. June 21st, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1976-09-11

Description

Pg.41 #2781 Looking upstream at Boulder Dam, from the Downstream Cofferdam. July 24th, 1934. Pg.41 #2783 Nevada Powerhouse from the Arizona Valve House bench. July 24th, 1934. Pg.41 #2764 View of the Nevada Powerhouse units from the Arizona retaining wall. July 20th, 1934. Pg.41 #2782 Arizona Powerhouse from the Arizona Valve House bench. July 24th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1976-09-18

Description

Pg.45 #2802 Looking downstream into the Arizona Spillway and No. 4 raise. Aug. 21st, 1934. Pg.45 #2803 Looking Downstream into No. 4 raise, showing the form work. Aug. 21st, 1934. Pg.45 #2794 Looking downstream from the Nevada side, toward the upstream face of Boulder Dam, showing the Spillways, Arizona Intake Towers and Cableways. Aug. 17th, 1934. Pg.45 #2825 Looking upstream in Upper No. 3 plug, showing pumpcrete and pipes. Aug. 25th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1976-11-05

Description

Pg.48 #2847 Looking upstream at Boulder Dam and the Powerhouse, from the downstream Cofferdam. Sept. 27th, 1934. Pg.48 #2850 Nevada Powerhouse from the Arizona Valve House bench. Sept. 27th, 1934. Pg.48 #2853 Close-up of the Nevada Powerhouse, showing the draft tubes. Sept. 27th, 1934. Pg.48 #2851 Arizona Powerhouse from the Nevada Valve House bench. Sept. 27th, 1934.