Transcribed from attached press release: "DRILLING LABORATORY The fundamental purpose of all Hughes rock bit research is to improve bit performance. In attaining this improvement it is necessary to balance design with the application of correct metallurgical materials and manufacturing methods. The preliminary proving ground is the Drilling laboratory housed in the main Laboratory building. Its field-size drilling rig, with 118 ft. derrick, was especially designed to test rock bits in a manner simulating oilfield drilling conditions."
Men and women in the Hughes Laboratory Machine Shop are devoted to the building of full-scale test models of rock bits, tool joints and other drilling tools for laboratory and field testing. In connection with the latter, the shop is equipped to manufacture these tools in sufficient quantities to make possible extensive and simultaneous field trials. The machine shop handles a large amount of work for Research, Product and Metallurgical Engineering divisions. This includes building new designs, new mechanisms and new devices for preliminary testing.
A black and white aerial view of the Hoover Dam Project area before the construction started. Written on the photo is: "Boulder City, Hoover Dam Project near Las Vegas, Nevada. Oakes #175."
The black and white view of a crowd of people awaiting the arrival of Howard Hughes in his Lockheed 14 aircraft at Floyd Bennett Airport, New York. This final landing for Hughes marked the end of his Round The World flight.