Skip to main content

Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 119931 - 119940 of 121622

Architectural drawing of the Playboy Hotel and Casino (Atlantic City), first floor plan, April 5, 1979

Date

1979-04-05

Description

First floor plans from 1979 for the construction of the Playboy Hotel and Casino. Includes revision dates. Original material: mylar. Drawn by Jerry C. and Aldo R. Project Architect: Fred AAnderson Job Captain: Bobby C.
Site Name: Playboy Hotel and Casino (Atlantic City)
Address: Florida Ave & Boardwalk, Atlantic City, NJ

Latest Drawing Revision: 1979-07-16

Image

Architectural drawing of Riviera Hotel tower addition (Las Vegas), longitudinal section, December 12, 1973

Date

1973-12-12

Description

Longitudinal building section for additions and alterations to the tower of the Riviera Hotel from 1974. Drawn by FD. Includes revision dates. Printed on mylar. John T. Iwamoto, delineator; Berton Charles Severson, architect; Brian Walter Webb, architect.
Site Name: Riviera Hotel and Casino
Address: 2901 Las Vegas Boulevard South

Latest Drawing Revision: 1974-06-18

Image

Architectural drawing of the New Frontier Hotel and Casino (Las Vegas), building section thru Post Time Lounge, March 24, 1967

Date

1967-03-24

Description

Sections and reflected ceiling plans for the Post Time Lounge at the New Frontier Hotel and Casino from 1967. Includes revision dates. Original medium: pencil on parchment. Socoloske, Zelner and Associates, structural engineers; Ira Tepper and Associates, mechanical engineers; J. L. Cusick and Associates, electrical engineers.
Site Name: Frontier
Address: 3120 Las Vegas Boulevard South

Latest Drawing Revision: 1967-03-22

Image

Slide of the construction phase of Hoover Dam, November 18, 1931

Date

1931-11-18

Description

Black and white image of the construction phase of the Boulder Canyon Project, also known as Hoover Dam. This image features the first round of drilling to enlarge the upper portal of diversion tunnel No. 2. The welded steel "Jumbo Rig" mounted on the truck has 25 air drills on it. The swing shift crew standing next to the rig prepare for work. Note: Boulder Dam was officially renamed Hoover Dam in 1947.

Image