Skip to main content

Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 21001 - 21010 of 142670

Prime Rewards ERS Files, table top 4 x 6, poster 22 x 28, duratrans 24 x 36, slot topper, undated

Level of Description

File

Archival Collection

Stardust Resort and Casino Records
To request this item in person:
Collection Number: MS-00515
Collection Name: Stardust Resort and Casino Records
Box/Folder: Box 040

Archival Component

Meeting minutes for Consolidated Student Senate, University of Nevada, Las Vegas, March 22, 2004

Date

2004-03-22

Description

Includes meeting minutes, along with additional information about letters.

Text

Photograph of the outlet portal showing the mole preparing to walk into the tunnel on the Las Vegas River Mountain Project, Las Vegas, Nevada, circa 1968-1971

Date

1968 to 1971

Description

A close-up view looking down from the left side of the outlet portal showing the mole preparing to walk into the tunnel. Three unidentified men can be seen working near the mole. The first stage of construction was completed between 1968-1971, and is comprised of a main aqueduct, a 3.78 mile tunnel through the River Mountains, eight pumping plants, and 31.4 miles of pipeline. This stage has a peaking capacity of 26.7 million cubic feet of potable water per day. The second stage enlarged the first stage system by expanding some of the existing facilities. New features included five pumping plants, the second barrel to the main aqueduct, and about 30 miles of pipeline and laterals with surge tanks, regulating tanks, and other delivery facilities. In conjunction with this stage, the State of Nevada enlarged and modified the Alfred Merritt Smith water treatment facilities to accommodate additional water supplies. The River Mountains Tunnel was constructed to full capacity in the first stage, and the Saddle Island intake facilities were oversized to accommodate both stages. The aqueduct system has a peaking capability of 53.4 million cubic feet of water per day. The River Mountains Tunnel was constructed during the first stage to accommodate second stage expansion. It is 3.78 miles long and was excavated through the River Mountains, which lie between Las Vegas Valley and Lake Mead. The concrete-lined tunnel has an inside diameter of 121.5 inches, and a maximum capacity of 608 cfs. The SNWA also constructed a larger tunnel, parallel to the River Mountains Tunnel for further expansion. The River Mountains Tunnel is used to convey raw water from Lake Mead to the River Mountains Water Treatment Facility that SNWA constructed near Henderson, NV. The River Mountains Facility, which began delivering treated water in October 2002, treats up to 300 million gallons of water per day, and was designed so it can expand to meet Southern Nevada's needs. In the future, the River Mountains facility will be able to treat up to 600 million gallons of water a day. This facility provides additional reliability and capacity to Southern Nevada's municipal water treatment and distribution capabilities.

Image

Workers for the Boulder Canyon Project gathered at a Six Companies dormitory in Boulder City, Nevada during the August 1931 labor strike, photograph and negative, 1931 August

Level of Description

File

Archival Collection

Elton and Madelaine Garrett Photograph and Architectural Drawing Collection
To request this item in person:
Collection Number: PH-00265
Collection Name: Elton and Madelaine Garrett Photograph and Architectural Drawing Collection
Box/Folder: Folder 03, Box 19

Archival Component

Transcript of interview with Irene Porter by Angela Moor, December 6, 2009: Planning a city and building homes

Date

2009-12-06

Description

After Irene Porter's father's retirement from the Air Force, the family moved to Las Vegas where her aunt and uncle were involved in the gaming industry. After she married, she and her husband Dick moved to Boston. They moved back to Las Vegas due to the bad economy in Boston. Irene worked for the Clark County Planning Department as a secretary but moved up to doing the work of the director, but without the title nor the pay of that position, so she went to work in the planning department of the city of North Las Vegas and became its director of planning. She was one of only five female planning directors in the country. Next Irene began lobbying at the Nevada legislature and became the first female full-time lobbyist in Nevada. She was fired from North Las Vegas following a secret meeting, and her subsequent lawsuit led directly to the first open meeting law in the state of Nevada. Irene then went to work for American Nevada Corporation, which was developing Green Valley. She became the first female project director on such a construction project. In 1977 Irene began to work for the Southern Nevada Homebuilders Association. She built it into an effective lobbying organization and continued to work as a lobbyist at the Nevada legislature. At the time of the interview, she was the executive director/CEO for the Southern Nevada Homebuilders Association.

Text

Allcock, C. C. Pathological Gamblers Are Neither Impulsive nor Sensation-Seekers, Australian and New Zealand Journal of Psychiatry 22(3), 1988

Level of Description

File

Archival Collection

UNLV Libraries Collection of Articles on Gaming and Las Vegas, Nevada Topics
To request this item in person:
Collection Number: MS-00626
Collection Name: UNLV Libraries Collection of Articles on Gaming and Las Vegas, Nevada Topics
Box/Folder: Box 11

Archival Component

#68177: Ken Hughes, Project Coordinator for the Facilities Department was recently named at the President's Classified Staff Employee of the Year, July 28, 2011, 2011 July 28

Level of Description

File

Archival Collection

University of Nevada, Las Vegas Creative Services Records (2010s)
To request this item in person:
Collection Number: PH-00388-05
Collection Name: University of Nevada, Las Vegas Creative Services Records (2010s)
Box/Folder: Digital File 00

Archival Component

#68580: Flowers in studio taken for the possible use in the Boyd Law School art project May 2, 2012 at the University of Nevada, Las Vegas, 2012 May 02

Level of Description

File

Archival Collection

University of Nevada, Las Vegas Creative Services Records (2010s)
To request this item in person:
Collection Number: PH-00388-05
Collection Name: University of Nevada, Las Vegas Creative Services Records (2010s)
Box/Folder: Digital File 00

Archival Component

#72585: Community sewing days at the Pincushion where writer, Jarret Keene, participated in the sewing circle working on the Amanda Browder Art Project, 2019 February 27

Level of Description

Item

Archival Collection

University of Nevada, Las Vegas Creative Services Records (2010s)
To request this item in person:
Collection Number: PH-00388-05
Collection Name: University of Nevada, Las Vegas Creative Services Records (2010s)
Box/Folder: Digital File 01

Archival Component