Skip to main content

Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 9541 - 9550 of 19621

Photograph of several posters in the interior of the Fremont Theatre, Las Vegas (Nev.), 1960

Date

1960

Archival Collection

Description

Black and white image of several posters in the interior of the Fremont Theatre. Site Name: Fremont Theatre (Las Vegas, Nev.)

Image

Photograph of excavation, Hoover Dam, March 28, 1932

Date

1932-03-28

Description

Nevada spillway open cut excavation, as seen from the Arizona side of the river. Site Name: Hoover Dam (dam)

Image

Photograph of an F-16 Fighting Falcon at Nellis Air Force Base, Nevada, March 31, 1983

Date

1983-03-31

Description

F-16 Fighting Falcon at Nellis Air Force Base, Nevada. Site Name: Nellis Air Force Base (Nev.)

Image

Architectural drawing of the Hacienda (Las Vegas), plot plan, March 25, 1963

Date

1963-03-25

Description

Plans for hotel room and public area additions for the Hacienda from 1963-1965. Includes hardware schedule. J. L. Cusick and Associates, electrical engineers; Harold L. Epstein and Associates, structural engineers; W. L. Donley and Associates, mechanical engineers.
Site Name: Hacienda
Address: 3590 Las Vegas Boulevard South

Latest Drawing Revision: 1963-06-13

Image

Architectural drawing of the Holiday Inn and Holiday Casino (Las Vegas), plot plan, August 4, 1969

Date

1969-08-04

Description

Plot plan of the proposed Holiday Inn and Holiday Casino in Las Vegas. Includes comparitive quantitities and revision date. Original medium: paper ozalid. The property became Harrah's Las Vegas in 1992.
Site Name: Holiday Casino
Address: 3475 Las Vegas Boulevard South

Latest Drawing Revision: 1969-09-18

Image

Architectural drawing of the Flamingo Hilton tower addition (Las Vegas), electrical plot plan, July 27, 1976

Date

1976-07-27

Description

Architectural plans for the addition of a tower to the Flamingo in 1976. Reduced sheet. Original material: parchment. Socoloske, Zelner and Associates, structural engineers; Harold L. Epstein and Associates, structural engineers; Bennett/Tepper, mechanical engineers; J. L. Cusick and Associates, electrical engineers.
Site Name: Flamingo Hotel and Casino
Address: 3555 Las Vegas Boulevard South

Image

Architectural drawing of the New Frontier Hotel and Casino (Las Vegas), plot plan, July 18, 1966

Date

1966-07-18

Description

Plot plan from the 1966 renovation of the Frontier Hotel and Casino. Original medium: pencil on parchment. Socoloske, Zelner and Associates, structural engineers; Ira Tepper and Associates, mechanical engineers; J. L. Cusick and Associates, electrical engineers.
Site Name: Frontier
Address: 3120 Las Vegas Boulevard South

Latest Drawing Revision: 1966-11-07

Image

Fremont Hotel and Casino additions and alterations: architectural drawings, image 095

Date

1967-12-01

Description

Electrical sheet for the Fremont Hotel and Casino from flat file 001c of the Martin Stern Architectural Records. This sheet contains a site plan depicting areas of work.

John S. Park Neighborhood Roundtable Discussion

Identifier

OH-02909

Abstract

John S. Park Neighborhood Roundtable Discussion with Robert Forbuss, Ina Porter, Sue Ann Porter, John Gubler, Mary Hausch, Judy Smith, and Margaret McGhie conducted by Richard Bryan on December 11, 2008 for the Voices of the Historic John S. Park Neighborhood Oral History Project. In this roundtable discussion, the participants take turns discussing their upbringing in Las Vegas, Nevada and living in the John S. Park neighborhood since the 1940s. The group recalls the deserted surrounding area, Fremont Street, and life during the Second World War. They talk about John S. Park Elementary School, the increase of homes being built in the area, and above ground nuclear bomb testing at the Nevada Test Site.

Archival Collection