Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1977-03-08

Description

Pg.53 #2905 Central section of the Powerhouse, looking toward the Nevada side, showing the floor level. No. 2 adit car in the extreme background. Oct. 30th, 1934. Pg.53 #2910 Looking downstream into the Arizona Powerhouse, showing location of the turbine rooms, from room galleries, and penstocks. Oct. 30th, 1934. Pg.53 #2908 Nevada Powerhouse, showing the reinforcing and walls around the penstock openings. Pumpcrete machine is in the butterfly valve gallery between the rock abutment and the turbine rooms. Oct. 30th, 1934. Pg.53 #2914 Looking upstream into the pipe gallery in the Nevada Powerhouse, showing beams and concrete. Oct. 30th, 1934.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1977-10-27

Description

Pg.66 #3136 Close-up of the Arizona Intake Towers - No.6 on left, No.3 on right. Note the forms for the dome of Intake Tower No.6. March 4th, 1935. Pg.66 #3133 View from the Arizona Spillway bridge, looking downstream into No.4 raise, showing general construction methods. Feb. 25th,1935. Pg.66 #3120 Looking downstream from the Arizona side, showing Boulder Dam, the Intake Towers and general layout. Note the dome formed on one of the Intake Towers. Feb. 25th, 1935. Pg.66 #3139 The run-around excavated in the old top heading adit, to facilitate handling concrete for No.4 Plug. March 4th, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-06-15

Description

Pg.75 #3293 View from the Nevada Utility Tower of Boulder Dam, showing the Memorial Day exercises in connection with the unveiling of the plaque commemorating the men who gave their lives in the construction of Boulder Dam. May 30, 1935. Pg.75 #3287 On crest of Boulder Dam, looking toward the Nevada side, showing final pour in the slot, which practically completes the concrete in Boulder Dam. May 29, 1935. Pg.75 #3298 View of Boulder Dam, from the Nevada side. The road, towers, and parapets are completed. June 1, 1935. Pg.75 #3282 Looking upstream at No.6 Intake Tower Top. Note the method of lowering the trash tracks into their respective slots. May 27, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-06-23

Description

Pg.76 #3269 Boulder Dam, looking downstream from the Arizona side. May 27, 1935. Pg.76 #3284 Looking in a general downstream direction, on the Arizona Black Canyon Highway, showing Six Companies Inc. road work. May 27, 1935. Pg.76 #3296 Boulder Dam, looking downstream from the Nevada side, showing Spillways and the Intake Towers. June 1, 1935. Pg.76 #3303 View of the open cut portion of the Switchyard Control Circuit Tunnel. Shovel is excavating for the Switchyard, and the building in the foreground is the power sub-station. The Babcock and Wilcox Company plant can be seen in the extreme background. June 1, 1935.

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1971-07-01

Description

p.5 #948 Foundations for the trash rack structure being installed in front of upper portal of Diversion Tunnel no.2. This is where the first pay concrete was poured. Mar. 7, 1932. p.5 #943 View of gravel plant, showing live storage of screened aggregate and sand in foreground. Storage pile for raw aggregate in background. Mar. 2, 1932. p.5 #951 Upper portals of Diversion Tunnels No.1 and 2. Note workmen scaling above portal of Diversion tunnel No.1. Mar. 7, 1932. p.5 #937 Night view of gravel plant, taken near first scalping screen, and looking in opposite direction than the view on left. Feb. 26, 1932.