An image of the Winged Figures of the Republic sculptures at the Hoover Dam on the day of the dam's dedication. Artist Oskar J. Hansen created the bronze sculptures.
p.3 #888 Lower portals of Diversion tunnels No.3 and 4 during flood. Feb. 10, 1932 p.3 #896 Bucyrus Erie 43-B gas-air shovel was the only piece of equipment caught by the flood. Feb. 10, 1932. p.3 #884 Looking across river at lower portal of Diversion Tunnel No.3. Feb 10, 1932 p.3 #897 Looking across river from Arizona side at upper portals of diversion tunnels No.1 and 2. Truck bridge in foreground has been partially washed out. Feb. 10, 1932.
p.6 #953 Looking out of upper portal of Diversion Tunnel No.2. Bucyrus Erie 43-B gas-air shovel reflected in pool of water. Mar. 7, 1932. p.6 #971 Flashlight close-up of workmen drilling on invert excavation. Mar. 7, 1932 p.6 #970 Flashlight photograph of drilling jumbo working on invert excavation at upper portal of Diversion Tunnel no.4 Mar. 8, 1932. p.6 #972 Wings extended for drilling fold back against the sides of drilling jumbo. Mar. 8, 1932.
p.9 #1011 Marion electric shovel with 3 1-2 cubic yard rock dipper loading into White 8 cubic yard truck, at Nevada spillway cut. Mar, 18, 1932. p.9 #1014 Mack truck with 14 cubic yard body being loaded at Nevada Spillway cut. Five similar trucks being used on this operation. Mar. 18, 1932. p.9 #1004 White truck dumping near site of Nevada spillway cut and extending road the for muck disposal. Mar. 16, 1932.
p.10 #1016 Gantry crane used in pouring concrete in invert section of upper Diversion Tunnel No.3. Mar. 18, 1932. p.10 #1019 View showing method of pouring concrete in invert section of tunnel lining. Mar. 18, 1932. p.10 #1018 view of invert forms in upper Diversion Tunnel No.3 showing method of pouring slabs. Trimming jumbo for aligning gauge of tunnels in background. Mar. 18, 1932. p.10 #1020 First 40 foot slab of concrete poured in lining diversion tunnels. Mar. 18, 1932.