Pg.35 #2703 Nevada Power House, from the Arizona Valve House bench. May 29th, 1934. Pg.35 #2701 Boulder Dam and Power House, looking upstream from the Downstream Cofferdam. May 29th, 1934. Pg.35 #2702 Arizona Power House, from the Nevada Valve House bench. May 29th, 1934. Pg.35 #2704 No. 5 unit of Nevada Power House, showing No. 3 pour completed. May 29th, 1934.
Pg.45 #2802 Looking downstream into the Arizona Spillway and No. 4 raise. Aug. 21st, 1934. Pg.45 #2803 Looking Downstream into No. 4 raise, showing the form work. Aug. 21st, 1934. Pg.45 #2794 Looking downstream from the Nevada side, toward the upstream face of Boulder Dam, showing the Spillways, Arizona Intake Towers and Cableways. Aug. 17th, 1934. Pg.45 #2825 Looking upstream in Upper No. 3 plug, showing pumpcrete and pipes. Aug. 25th, 1934.
An image of the Boulder Dam intake towers in the newly impounded Lake Mead, as seen from the Nevada side. Power lines originating from the dam are visible on the mountains in the background. Boulder Dam was officially renamed Hoover Dam in 1947.
Pg.88 #3401 Boulder Dam and Intake Towers, from Arizona side. Aug. 26, 1935. Pg.88 #3408 Looking upstream toward Nevada Spillway drainage flume and general area. Aug. 26, 1935. Pg.88 #3391 Looking upstream toward Boulder Lake, from Observation Point. Aug. 21, 1935. Pg.88 #3409 View taken from Arizona Intake Towers, looking toward Arizona Spillway. Note excavation for the float well supply line. Aug. 26, 1935.
Three postcards. Grand Canyon from Lake Mead; Boulder Dam Crest and Switchback Highway on Arizona Side; Arizona Spillway and Highway Bridge, Boulder Dam.