Pg.83 #3352 - #3353 Panorama, looking upstream toward Boulder Dam reservoir, from Observation Point. July 25, 1935. Pg.83 #3351 Looking downstream toward Boulder Dam, from the Arizona side. July 25. 1935. Pg.83 #3370 View taken from the Nevada side, looking downstream toward Boulder Dam. July 26, 1935.
Pg.38 #2720 Form work in Units 8 and 9, Arizona Power House. June 14th, 1934. Pg.38 #2733 Nevada Power House layout. June 21st, 1934. Pg.38 #2730 Night photograph of Power House construction. June 19th, 1934. Pg.38 #2732 Arizona Power House layout. June 21st, 1934.
Pg.97 #3512 Looking upstream in Arizona Valve House. Note three gates and needle valves have been installed. Oct. 29, 1935. Pg.97 #3497 View from top of Boulder Dam, looking toward Power House, Valve Houses and lower portals of Diversion Tunnels. Oct. 28, 1935.
Pg.21 #2541 General view of Nevada Intake Towers from Arizona side, showing Lomix trestle below. Feb. 20th, 1934. Pg.21 #2540 General view of Nevada Intake Towers and Spillway from Nevada Himix Trestle. Feb. 20th, 1934.
Pg.31 #2666 Looking upstream in Black Canyon, showing the downstream face of Boulder Dam. April 30th, 1934. Pg.31 #2659 View showing installation of 100-ft. Drum Gates in the Arizona spillway. April 28th, 1934. Pg.31 #2664 Looking upstream in No. 5 Penstock tunnel, showing penstock outlets, manways and pedestal recesses. April 28th, 1934.