An image of a man standing by a car and looking at a sign with directions for Boulder Dam, Boulder Ferry, and Kingman, Arizona. Note: Boulder Dam was officially renamed Hoover Dam in 1947.
Black and white image of officials from the Six Companies of San Francisco and the Bureau of Reclamation, as well as some local individuals, signing the contract to construct Hoover Dam (note: Boulder Dam was officially renamed Hoover Dam in 1947). Henry J. Kaiser is seated, signing the contract. Standing at the second spot from the left is Al Cahlan, Las Vegas Review Journal Managing Editor. Standing at the far right is Charles P. "Pop" Squires. Also identified in the photograph (in no particular order) are W.R. Armstrong, Walker J. Young (Bureau of Reclamation Engineer), R.F. Walter, and Louis Crampton.
This series of photographs documents the historic water overflow at Hoover Dam as seen from the Arizona side of the dam. Taken in August of 1983, this overflow marked the first time the spillways were used during a flood. After initially being filled, the spillways were tested once in August of 1941.
This series of photographs documents the historic water overflow at Hoover Dam as seen from the Arizona side of the dam. Taken in August of 1983, this overflow marked the first time the spillways were used during a flood. After initially being filled, the spillways were tested once in August of 1941.
This series of photographs documents the historic water overflow at Hoover Dam as seen from the Arizona side of the dam. Taken in August of 1983, this overflow marked the first time the spillways were used during a flood. After initially being filled, the spillways were tested once in August of 1941.
This series of photographs documents the historic water overflow at Hoover Dam as seen from the Arizona side of the dam. Taken in August of 1983, this overflow marked the first time the spillways were used during a flood. After initially being filled, the spillways were tested once in August of 1941.