Skip to main content

Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 1 - 10 of 41

Bootleg bar: photographic print

Date

1931 to 1932

Description

Liberty's Last Stand, a bootleg bar set up on Block 16, LV (1931-1932) as part of federal sting operation.

Image

Film strip of Boulder City or Hoover Dam construction, image 001: photographic print

Date

1930 (year approximate) to 1939 (year approximate)

Description

This photograph has three images. The first one, (0272_0002) reads, "Transports coming from dam-day shift. Climbing out the sides to be one of first in the commissary for a bottle of beer. It's been hot down there and they are thirsty," as a handwritten inscription. The second one, (0272_0003) reads, "One of several dorms that happened to be mine. (The arrow points to room) No grass to mow. One of its good points. Radios would not receive programs until early night, reason- no ground-no moisture in soil," in a handwritten inscription. The Six Companies Inc. dormitory housing 172 men, Boulder City, NV. The third picture, (0272_0004) which is upside down, reads "One pour wide getting in each other's way; hi-line moving catwalk soon will be finished," as a handwritten inscription on the image about the Hoover Dam under construction.

Image

Film strip of Boulder City or Hoover Dam construction, image 002: photographic print

Date

1937-11-11

Description

This photograph has three images. The first one, (0272_0005), reads "This picture shows 'tail tower'. Each tower has a 50 ton counter-weight on each tower. Man sitting on tract is tender," as a handwritten inscription. The second, (0272_0006), reads "The view the operators see. Head towers of four hi-lines- I understand this is the first time this type of handling the mud, ever been used," as a handwritten inscription. It shows No.7 and 8 at left of photo and No.5 and 6 at right. The third, (0272_0007) that's upside down reads, "Upstream face nearing completion began collecting water. Notice how small the men look on the catwalks. This picture taken Jan. 5th, 1935," as a handwritten inscription.

Image

Film strip of Boulder City or Hoover Dam construction, image 003: photographic print

Date

1930 (year approximate) to 1939 (year approximate)

Description

This photograph has three images. The first one, (0272_0008), is a newspaper photo and the headline reads "Workers Receive Last Paychecks." The caption reads, "With its contract fulfilled the Six Companies Corporation turned Boulder Dam over to the government yesterday. Workmen on the project are showing receiving their last paychecks as the engineering concern closed books. Some 1600 men will remain as government employees." The second one, (0272_0009) rotated to the right, shows a Mess Hall for Six Companies employees. It reads, "The best of meals were served three times a day, and when each shift starts down to work, all the sandwiches you can carry plus drinks $1.75 a day with room. Entrance on right is celebrity dining room where lots of movie stars had dinner. Clara Bow came often. She and husband had a ranch nearby. (Bell Ranch)," as a handwritten inscription. The third one (0272_0010) that's upside down, shows a Motor transport (150 men), Boulder Dam. (U.S. Bureau of Reclamation photo). It reads, "Too tired and sleepy to want anything but a shower and bed," as a handwritten inscription.

Image

Film strip of individuals or Hoover Dam construction, image 001: photographic print

Date

1930 (year approximate) to 1939 (year approximate)

Description

This photograph has three images. The first one, (0272_0011) depicts two people. It reads, "Georgia and I at entrance to top of dam. Head tower of massif government hi-line, to handle 50 ton sections of pipe," as a handwritten inscription. The second one, (0272_0012), also shows two people and reads "York and Georgia." The third one, (0272_0013) that's rotated reads "Another view of head tower of government line; notice large 6 cables it uses," as a handwritten inscription.

Image

Film strip of Boulder City or Hoover Dam construction, image 004: photographic print

Date

1935-09-30

Description

This photograph has three images. The first one, (0272_0014) reads, "Train load of gravel coming in three shay engines used for this load. Gravel comes from downstream of Boulder Canyon," as a handwritten inscription. The second one (0272_0015) that's upside down reads "March 9, 1934. New Union Pacific Train arrives at Boulder Dam." The third one (0272_0016) that's vertical shows the top workings on Boulder Dam from NV rim of Black Canyon (U.S. Bureau of Reclamation photo). It reads, "Top of dam about one form wide, everyone getting in each others way. '(0)' shows how much the slant of the dam has shortened the pours - form raisers have this one in place, waiting for carpenters to build the short side panels. (x) points out upstream face panels - form raisers nightmare, water soaked and patched up, very leery of climbing out, and straddling that lower 2x6 and start unbolting the panel. Notice the hand rails on other panels, but nothing to protect you from walking off the most thrilling fall of your life. Reeves often would (when we were safely out of sight, sitting astride a 2x6) he would sling out a bolt, and wait that long, long minute before it hit bottom. And say, 'Boy,' I'd hate to fall that far.' To be continued."

Image

Film strip of individuals or Hoover Dam construction, image 002: photographic print

Date

1930 (year approximate) to 1939 (year approximate)

Description

This photograph has three images. The first one (0272_0017) rotated to the left reads, "High mixing plant (blending and mixing plant," as a handwritten inscription. The second one (0272_0018) reads "Shay engine used at mixing plant. Instead of pistons or drivers, wheels are turned by screws; screw driven," as a handwritten inscription. The third one (0272_0019) is a picture of two people, and it reads, "York and Georgia at screening plant,"on the back.

Image

Film strip of individuals or Hoover Dam construction, image 003: photographic print

Date

1930 (year approximate) to 1939 (year approximate)

Description

This photograph has three images. The first one, (0272_0020) reads, "Personal pictures taken by Tommy Teas (my brother-in-law) of his work mates on #8 line. Bucket swinging, hard to spot. It hanging about 500 ft. Bell boy talking to operator who is out of sight on top of mountain," as a handwritten inscription. The second one (0272_0021) reads "Men building key, about 10 in. high and two ft. wide. (1) Bell boy getting a good sight to spot the bucket in the right place," as a handwritten inscription. The third one (0272_0022) is an upside down picture of the Dam. Its handmade inscription reads, "Still below river bed. Good look at a pouring crew (x) shows bell boy giving orders to operator. Nice shot showing how bucket works. After the bucket leaves, the men will walk all through the fresh mud to walk out any air pockets."

Image

Film strip of Boulder City or Hoover Dam construction, image 005: photographic print

Date

1930 (year approximate) to 1939 (year approximate)

Description

This photograph has three images. The first one (0272_0023) has a handwritten inscription that reads, "Part of foundation for powerhouse" (on Boulder Dam). The second one (0272_0024) reads, "Arizona outlets for valve house on Boulder Dam. Penstocks protruding, waiting for the valve house to be built around them. (x) shows location of working tunnel to receive the pipes to put them in place. Will be plugged later." The third one (0272_0025) reads, "The Dam - indentation in canyon walls are for intake towers. Comparatively small down between the gigantic walls of Black Canyon. Still below river level, but looks like a lot of concrete to me. Train (x) on trussel, with 8 yds. bucket of mud, from lower mixing plant. Nice stroll across the catwalk ($) or better yet, try climbing that wig-wagging stairway wiggling up the canyon wall. I know a guy who did it (once)," as a handwritten inscription.

Image

Film strip of Boulder City or Hoover Dam construction, image 006: photographic print

Date

1934-05-29

Description

This photograph has three images. The first one (0272_0026) is a picture of the first bucket of concrete poured in Boulder Dam, June 6, 1933. The handwritten inscription reads, "The first bucket was 'grout' (cement and water) which was spread over surface of pour with steel brooms. All loose rocks have been pried out, and all cracks have been pumped with grout until filled. Some has taken a week of continuously pumping night and day. Each from and pour is supervised by government selected men." The second one (0272_0027) reads, "Excavation for foundation three hundred feet below river bed down to bedrock." The picture is looking upstream, excavation for dam foundation, Boulder Dam photo provided by the Bureau of Reclamation. It also says, "Seen from lookout point above. Trucks struggling up and down the steep grade, reminds you of ants as they attack this giant job. I often wondered where did they put all this dirt and rubble? Brakes were soon worn out and never replaced. Trucks were geared down real low, but you still got a thrill, going downhill. x-marks trussel for rail that will bring concrete from lower mixing plant around the bend where the mts. end in a gentle slope." written as a handwritten inscription. The third one (0272_0028) reads, "Drilling of walls to clean up and to blast off loose slabs on upstream canyon walls. These men climb hand over hand at end of shift, and slide down to work. The art of keeping your balance in a bos'n chair is picked up in a hurry at heights like this. I saw a miner hand a 90 lb. Hammer of his shoulder and climb hand over hand 75 ft. up, until he got past the overhang before he could touch the canyon wall with his feet. It was a side show," written as a handwritten inscription.

Image