Access Restricted Archival objects in this container: Sewer easement plans and correspondence, 1990 to 1994 Sanitary sewer design report, 1991 May City of Henderson sewer correspondence, 1991 to 1994 General sewer correspondence, 1992 to 1994 Sewer intercepter agreement, 1990 to 1994 Nevada Department of Transportation (NDOT) permit, 1993 to 1994 Gibson sewer correspondence, 1991 to 1992 Geologic constraints report, 1989 September 29 Geotechnical contract, 1991 March Detention basin geotechnical contract, 1991 to 1994 Geotechnical proposals, 1991 Geotechnical report for Sunridge at MacDonald Ranch, 1991 May 24 RANPAC Soils geotechnical reports and maps, 1989 Detention basin geotechnical report, 1991 June 26 Sections 28 and 29 preliminary geotechnical report, 1986 October 27 Grading plans and correspondence, 1991 General soil correspondence, 1989 to 1991