Archival objects in this container: Upstream face of Boulder Dam: photographic print, 1933 December 27 Upstream face of Boulder Dam: photographic print, 1934 January 24 View from reservoir, looking downstream at Boulder Dam and intake towers: photographic print, 1935 November 26 View of Boulder Dam, from the Nevada side. The road, towers, and parapets are completed: photographic print, 1935 June 01 View of Nevada side of lower portals clean-up: photographic print, 1935 August 26 View of power house turbine gallery, elevation 643, looking downstream on the Arizona side: photographic print, 1935 April 10 View of the Nevada powerhouse units from the Arizona retaining wall: photographic print, 1934 July 20 View taken from Number 4 raise, looking upstream at the Arizona spillway bridge: photographic print, 1935 March 26 View taken from the Arizona side, looking across the top of Boulder Dam, showing elevator and utility towers: photographic print, 1935 January 02 View taken from the valve house catwalk, looking upstream toward the power house: photographic print, 1935 June 24 Arizona intake towers: photographic print, 1933 December 27 Arizona intake towers. The head tower for Number 10 cableway is erected and the 180 ft. boom derrick is nearly complete: photographic print, 1933 December 01 Arizona powerhouse from the Arizona valve house bench: photographic print, 1934 July 24 Arizona powerhouse from the Nevada valve house bench: photographic print, 1934 September 27 Arizona powerhouse layout: photographic print, 1934 June 21 Diversion of the Colorado River into diversion tunnel Number 1 as the gate on diversion tunnel Number 4 is being lowered: photographic print, 1935 February 01 Forms for transition at the downstream plug of diversion tunnel Number 2: photographic print, 1934 January 27 From Arizona spillway Gate House, looking upstream. Note float well supply line finished and construction on upstream abutment wall: photographic print, 1935 September 26 General view of Himix and cement blending plants, with unloading track and aggregate bins above: photographic print, 1934 April 17 Looking downstream in lower Number 2 plug, showing form work: photographic print, 1934 February 20 Looking downstream into the Nevada spillway: photographic print, 1934 October 25 Looking downstream over top of Boulder Dam, showing Lomix unloading trestle: photographic print, 1934 February 20 Looking into Number 3 downstream plug, from the Nevada plug adit. Note forms for the first pour being built: photographic print, 1935 July 26 Looking upstream at Number 6 intake tower top. Note the method of lowering the trash tracks into their respective slots: photographic print, 1935 May 27 Looking upstream from Observation Point, showing the reservoir area: photographic print, 1935 June 24 Load More