Skip to main content

Search the Special Collections and Archives Portal

Memo about supplying water to the Las Vegas Gunnery School, June 19, 1947

File

File
Download hln000904.tif (image/tiff; 22.58 MB)

Information

Date

1947-06-19

Description

Discussion of the alternatives of supplying water to the Las Vegas Gunnery School (now a part of Nellis Air Force Base).

Digital ID

hln000904

Physical Identifier

Box 13 Folder W23-1-C Water Conservation - Supply from Lake Mead
    Details

    Citation

    hln000904. Union Pacific Railroad Collection, 1828-1995. MS-00397. Special Collections and Archives, University Libraries, University of Nevada, Las Vegas. Las Vegas, Nevada. http://n2t.net/ark:/62930/d10c4wk0j

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at?special.collections@unlv.edu.

    Standardized Rights Statement

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Digital Processing Note

    Manual transcription

    Language

    English

    Format

    application/pdf

    OFFICE MEMO Las Vegas - June 19, 1947 Colonel Sullivan, in charge of the Las Vegas Gunnery School, phoned for an appointment at 2:30 P.M. today in connection with a supply of water to the field when it is reactivated. Major Crosse and Captain Reed, representing the Colonel, called at the office and stated they were con- sidering one of three plans to provide sufficient water for the field. (1) To ask that sufficient water be allocated for use of the field so that when the Water District is formed and acquires the water mains of the LVL&W Co. a lateral can be taken off from the proposed 30" line to lead to the field. (2) In the event plan (1) is not available in time, they propose to lay their own 12" C.I. line from BMI to the field. (3) Obtain from LVL&W Co. a connection with the City supply and lay their own line to the field. In the interim, pending developments above mentioned, I suggested consideration be given to drilling one or two addi- tional wells on the Rains Ranch, from which the field is now obtaining a supply of water through 10" transmission main. They stated the Rains well is now producing 250 gpm artlsian flow and they also have a pump well. I advised them our per capita consumption is 700 gallons in July and August; that the consumption in those months of last year was fourteen million gallons per day and that under the circumstances we were scarcely in a position to supply any large amount of water for the field without developing additional sources. They estimate 6,000 men at the field eventually who would require approximately four million gallons per day, based on our per capita consump- tion; or two million four hundred thousand gallons per day, based on their estimated per capita of 400 gallons. They were provided with a copy of Maxey's Water Resources Bulletin #6, reflecting discharge from underground channels and approximate rate of re-charge. They are making further study of the situation and I asked them to feel free to call upon us for any assistance we could render.