Skip to main content

Search the Special Collections and Archives Portal

upr000348 9

Image

File
Download upr000348-009.tif (image/tiff; 23.36 MB)

Information

Digital ID

upr000348-009
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Form 2191 -B 5-62-300M U N IO N P A C IF IC R A IL R O A D C O M P A N Y TELEGRAM JUG NAZI. CY TEH 'CEENIHG RELOCATION, REINFORCEMENT, OR RB-VEGAS VALLEY WATER DISTRICT PIPELINES UNDER THIS NATTER HAS SEEN DISCUSSED WITH LOS ANGELES - MARCH 4, 1964 Mftrt o AND TAX DEPARTMENT WHICH ADVISES THAT VEGAS YARDS ARE COVERED B Y TWO EASEMENTS IDENTIFIED RESPEC­TIVELY AS LA&3L DEED AUDIT NOS. 5352 AND 5385.' BOTE DOCUMENTS CONTAIN A SECTION PROVIDINGS ”IF A NY WATER PIPELINES AND AP­PURTENANCES SHALL HAVE BEEN INSTALLED IN ANY SUCH EASEMENT STRIPS IN ACCORDANCE WITH PROVISIONS OF THIS DEED (RAILROAD COMPANY) SHALL BEAR T HE EXPENSE OF ANY ADDITIONAL REINFORCE­MENT, RELOCATION OR REPLACEMENT OF SAID WATER PIPELINES AND APPURTENANCES WHICH MAY THEREAFTER B E REQUIRED TO PROTECT SAID WATER PIPELINES B Y REASON OF T H E CONSTRUCTION OF NEW RAILROAD TOACSS OR RAILROAD OPERATING FACILITIES, OR CHANGE OF GRADS OF EXISTING RAILROAD TRACKS OR RAILROAD OPERATING FACILITIES, OVER OR UNDER SAID WATER PIPELINES. 0 ACCORDINGLY, IF T HE CONDITIONS OF T H E ABOVE i^OTED PARAGRAPH EXIST, THEN THE WORK WOULD HAVE T O B E ACCOMPLISHED AT THE RAILROAD COMPANY*$ SOLE EXPENSE. R-32* WATER DISTRICT PIPELINES WITHIN THE LAS BCR