Skip to main content

Search the Special Collections and Archives Portal

upr000338 47

Image

File
Download upr000338-047.tif (image/tiff; 26.12 MB)

Information

Digital ID

upr000338-047
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    \ M r, H, L . Adamson, Sheet N o. 1 9 . Fuel O il Gal. Zm o i l discharge lin e to sunp Excavation-co muon c .y • 2" W .I. pipe including a ll necessary fittin g s in p la ce, l i n . f t . Labor Matl. Total 2000 $198.57 $58.58 9 1.50 .05 40 30*01 10.05 $666.69 (19) 245’ o f 2 " o i l discharge lin e and snap located ju st south o f fu e l o i l tank has been in stalled since date o f valuation and with the exception o f 40* detailed above, has not been ca p ita lized . Work Order 5401, completed June 16, 1925 in s ta ll 300' o f o il over-flow pipe lin e from o il delivery tank to storage tank and in s ta ll 2 - 8 " gate valves between susp and pump, Excavati on-co muon o .y . 18 $58.46 $ 1.75 B ackfill c .y . 18 4*00 .12 New 6" W .I. pipe with a l l necessary fittin g s in p lace, l i n . f t . 300 38.86 945.84 New 8* screw gate valve in p la ce, ea. 1 10.32 12.94 3 .3 , 8*» screw gate valve in p la ce, ea. 1 10 .32 •88 $489.49 (19) Work Order 815, completed in 1910 0 . H. steam pipe from power to connection with steam lin e to fuel o i l unloading box. According to station print th is lin e is now 4W pipe but I do not find adjustment in capital account to care for the increase in size o f pipe. 2fe” pipe lin e with fittin g s couplets in place (estimated ledger value) l i n . f t . 200 $ 89.00 (20) Ledger value o f supports fo r this overhead pipe lin e should be included herein, but d eta il o f their construction is not of record in this o f f ic e . I f ledger value is desired, kind and quantity o f material used in th eir construction should be furnished. Work Order 5456, completed la rch 29, 1926 Lay steam lin e from pipe lin e given above, to unloading box. New 2" black pipe including redwood conduit, spasbestos lagging and a ll necessary fit t in g s , l i n . f t . 1250.9 $914.72 $977.12 $691.84 (92)