Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
^ Mr. R. L. Adamson, Sheet KTo. IS* Labor Mat’ l T o ta l 93* Of 8" pipe with fittin g s complete in place (from unloading box to storage tank) 187* o f 6" pipe with fittin g s couplets in place (from storage tank to delivery tank) $109.20 $426.47 $535.67 (19) Installed about 1915 ^uel o i l supply lin e from o il storage tank to power hou.se 350 * o f 4* pipe and fittin g s ) 595’ o f 4g* • : * ' « * ) 205’ o f 5B " " " ) $928.26 (29) 2* steam lin e located with above pipe lin e , complete in p la ce, (estimated ledger value) l i n . f t . 1150 $341.55 (29) ^he record does not indicate that the 2" over head steam lin e from Machine Shop at south end o f Hound House to fu el o i l supply lin e was ever ca p ita lized . Work Order 1799, completed February 1917 Fuel o il storage tanks couplets in place including pipe and fitt in g s , ea. 2 $ 35.19 $763.83 HO foundation 31.46 21.60 $852.08 (29) Q.M»0. 576, conpleted June 1917 Construct fu el o i l punp house 10*xl2’ corrugated iron sides and roof fuel o i l punp house constructed with salvaged m aterial, ea. 1 Work Order 3402, completed February 27, 1921 In sta ll 60 f t . o f 24" R.C. pipe in earth f i l l under tr e s tle (now earth embankment-tre s tle was retired ) to serve as conduit fo r o il lin e from storage tank to delivery tank, 24* B.O. concrete pipe l i n . f t . 60 Work Order 5590. completed la rch 30, 1925 Construct 1367 e .y . earth o ile d levee around fuel o i l tank and 40* o f S.H. 2* o il discharge lin e 7* high by 596.8* long earth oiled levee Embankment - commonC ontract c .y . 1367 Coup any $ 12.00 $ 18.42 $ 55.74 $ 62.67 $410.10 $ 17.31 .52 $ 30.42 (19) $118.41 (19)