Skip to main content

Search the Special Collections and Archives Portal

upr000338 38

Image

File
Download upr000338-038.tif (image/tiff; 26.29 MB)

Information

Digital ID

upr000338-038
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Labor H a t 'l T o ta l Mr. B. L. Adamson, \ %e©t Ko. 4 . Work Order 2554. completed December 51, 1916 16“ Bwd. stave pipe lin e including a ll fittin g s complete, from end o f 16* cast iron pipe lin e to 16" Tit* pipe encased. in concrete, $410.20 $6,368.89 $6,779.09 (18) Work Order 1965* completed. August 31* 1918 16“ T it. pipe lin e encased in concrete including a ll fittin g s complete, from forebay in center and across creek at mouth o f feeders, to concrete box connecting this lin e to 16** Bwd. stave pipe lin e constructed tender Work Order 2982* Also 16“ T it. pipe lin e encased in concrete lying between 16* Bwd. stave pipe lines constructed tinder Work Orders 2982 and 2354, (Labor and material) $3,814.03 (18) Engineering $ 36.18 ( 1) Work Order 2982. completed June 21. 1920 16* I . D* continuous rwd. stave pipe lin e including a l l fittin g s complete, from concrete box to 16* T it . pipe lin e encased in concrete, * $367.55 $5,721.41 $6,088.96 (18) HOTS: Ledger value o f concrete box is assumed to be included in these figu res. The 16" wood stave pipe was renewed between Eng. Sta. 0+00 and 2+00 under Operating Expense Work Order 0-30 and between Eng. Sta. 2+42.1 and 39+93 under Operating Expense Woifc Order 0-109. (0+00 in the above is the 16" valve located ju st westerly from the B» & B. Shop) The cost o f replacement under the above *ork Orders is not o f record in th is o f f ic e , but is available in the D ivision Accounting Bureau. Work Order 1053. completed in 1911 Wood frame housing over "Big Spring* 2580’ o f 12" reinforced concrete pipe lin e from "Big Spring1* to S’orebay, (Labor and Material) $3,837.80 (18) Work Order 4707. completed October 29. 1925 D r ill and case 12* w ell to depth o f 635' Engineering Interest during construction 12* d rille d w e ll, case, including cap and S.H. 12* gate valve, complete, l i n . f t . 635 Contract Extra force Company in terest during construction $107.64 $ 2.61 ________ .21 & 110.46 ( 1) $5,431.18 453.80 $ 27.04 71.75 ________ 14.99 i5.998.76 (18)