Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
Labor H a t 'l T o ta l Mr. B. L. Adamson, \ %e©t Ko. 4 . Work Order 2554. completed December 51, 1916 16“ Bwd. stave pipe lin e including a ll fittin g s complete, from end o f 16* cast iron pipe lin e to 16" Tit* pipe encased. in concrete, $410.20 $6,368.89 $6,779.09 (18) Work Order 1965* completed. August 31* 1918 16“ T it. pipe lin e encased in concrete including a ll fittin g s complete, from forebay in center and across creek at mouth o f feeders, to concrete box connecting this lin e to 16** Bwd. stave pipe lin e constructed tender Work Order 2982* Also 16“ T it. pipe lin e encased in concrete lying between 16* Bwd. stave pipe lines constructed tinder Work Orders 2982 and 2354, (Labor and material) $3,814.03 (18) Engineering $ 36.18 ( 1) Work Order 2982. completed June 21. 1920 16* I . D* continuous rwd. stave pipe lin e including a l l fittin g s complete, from concrete box to 16* T it . pipe lin e encased in concrete, * $367.55 $5,721.41 $6,088.96 (18) HOTS: Ledger value o f concrete box is assumed to be included in these figu res. The 16" wood stave pipe was renewed between Eng. Sta. 0+00 and 2+00 under Operating Expense Work Order 0-30 and between Eng. Sta. 2+42.1 and 39+93 under Operating Expense Woifc Order 0-109. (0+00 in the above is the 16" valve located ju st westerly from the B» & B. Shop) The cost o f replacement under the above *ork Orders is not o f record in th is o f f ic e , but is available in the D ivision Accounting Bureau. Work Order 1053. completed in 1911 Wood frame housing over "Big Spring* 2580’ o f 12" reinforced concrete pipe lin e from "Big Spring1* to S’orebay, (Labor and Material) $3,837.80 (18) Work Order 4707. completed October 29. 1925 D r ill and case 12* w ell to depth o f 635' Engineering Interest during construction 12* d rille d w e ll, case, including cap and S.H. 12* gate valve, complete, l i n . f t . 635 Contract Extra force Company in terest during construction $107.64 $ 2.61 ________ .21 & 110.46 ( 1) $5,431.18 453.80 $ 27.04 71.75 ________ 14.99 i5.998.76 (18)