Skip to main content

Search the Special Collections and Archives Portal

upr000337 111

Image

File
Download upr000337-111.tif (image/tiff; 25.7 MB)

Information

Digital ID

upr000337-111
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    ledger Value Coach P ipelin e and Hydrants, la s Vegas lo s Angeles, December 5, 1924 Mr* H. C. Mann: R eferring to your mailgram addressed to Mr. Cunningham #D-293, dated November 24th, w ith copy to m yself, requesting that I flim ish Ledger Value of 1980’ o f 6" W. I* p ip e lin e including 22 hydrants serving the coach lin e : A study of our records w ith regard to t h is w ater lin e has uncovered the fo llo w in g fa c ts: During the Caliente west construction in 1903-04 a 3" lin e was con­structed together w ith hydrant boxes serving the coach lin e . Under Appropri­a tio n 531 in 1906 the o rig in a l hydrant boxes were replaced. On August 7, 1907, Appropriation 678 was approved c a llin g fo r the con­struction, among other f a c i l i t i e s , of 500 f t . o f 8'* w ater lin e , 350 f t . of 4“ drain lin e and a 10" standpipe; the w ater lin e to run from the 70,000 ga llo n tank along Track No. 1 to the 10" standpipe to be located 200 f t . east o f the edge of the turntable between Tracks No. 1 and 2. This pipe lin e w ith stand­pipe was not constructed however, the money authorized being used to construct 1429 f t . 5" o f 10" machine banded riveted stave pipe connecting the 10" stand­pipe constructed under Appropriation 870 in 1909-10 with the main pipe lin e from the spring and replacin g a lik e length o f the o rig in a l 3" coach water lin e . Under Appropriation 870 in 1909-10, 1224 f t . of 6"& 10" redwood stave pipe lin e together with a 10" standpipe extension easterly was constructed to above 10" lin e , replacing remaining portion of the o rig in a l 3" lin e . Appropriation 1332 in June 1914 covers replacement o f the 6" wood stave pipe w ith the present 6" O.D. casing and Appropriation 1965 in August 1918 covers replacement of the 10" wood stave pipe and standpipe w ith e x istin g 6" O.D. casing.