Skip to main content

Search the Special Collections and Archives Portal

upr000337 49

Image

File
Download upr000337-049.tif (image/tiff; 25.83 MB)

Information

Digital ID

upr000337-049
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    F orm 7 3 6 3 S T A N D A R D 11-24-1000 U N IO N P A C IF IC S Y S T E M UNION PACIFIC RAILROAD COMPANY , OREGON SHORT LINE RAILROAD COMPANY OREGON-WASHINGTON RAILROAD & NAVIGATION COMPANY LOS ANGELES & SALT LAKE RAILROAD COMPANY THE ST. JOSEPH & GRAND ISLAND RAILWAY COMPANY W m . M. BARR, CONSULTING CHEMIST O M A H A , N E B . , A p r i l 1 4 # 1 9 2 5 , SUBJECT: Budget Item 98 - W.G. 4707. Mr. S’. H. .Knickerbocker, Gen. Mgr., LA&SL m Co., Los Angeles C e lif. Bear S ir: Referring to your le tt e rs of March 18th and 30th with estimate o f work to be done under Budget Item 98, on Las Vegas water supply: The estimate shown here is considerably in excess of the budget item owing to operating expense work amounting to #11,995. The settlin g basin with f i l t e r fo r water softener, amounting to 13330 was recommended by me and your plans and estimates are en tirely in accord with my idea fo r th is work. Under costs of new parts to replace parts retired , you have a store expense o f #1493. X believe th is is excessive as th is material would be ordered direct and delivered to the job and i t is my under* standing that \% is allowed to the store on this kind of m aterial. It is my understanding that the estimate which you have submitted covers replacement o f old pipe line that was called fo r under Budget Item 228, approved September 18, 1923 and which was not completed. I f th is is true, a l l o f the work shown in the drawings meets with my approval and has my recommendation. 1 do not quite understand why some of th is work should be carried over into the new budget item inasmuch as the work had been previously approved and work order issued* I may not be quite c le a r on th is but in any case 1 would recommend the replacement o f the old V.C* pipe by wood stave pipe on account o f the d iffic u lt ie s experienced in the past with th is pipe and would also recommend the 24s wood stave pipe called fo r at the upper end o f the lin e , in order to reduce losses in pressure due to fric tio n . Mr. Calvin may wish to submit the work order to me fo r approval a ft e r i t has been submitted. Yours truly,