Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
1 ' 1 1 : 1 : S p e n d i n g f||§ ' TRACE...\| \ \ LOS AMELES, October 11th, 1918. FILE - 6 1 3 MR. 1, H. FOSTER: — Referring to your letter of October 2nd, quoting letter from the Pacific Sewer Pipe Company, in which they request that we send to Los Angeles as many joints of the pipe line at Las Togas as we think necessary to test. As explained in previous correspondence the pipe is all under ground in the line. We hope to use about 5,000 feet of the line extending eastward from the spring. The first 3,000 feet of the line is njdt encasedin concrete but the remainder of it is. As we ^4xpect to use that part of the line not encased in concrete/it would not be advisable to remove any part of it, and it wjuld not be practicable to remove the joints from that part of crete. the line encased in conThe Pipe Company must realize that pipe which was furnished is of the same quality as all other pipe manufactured by their company, and it is not at all necessary to furnish sections of pipe from the line at Las Vegas for test purposes. What I had in mine for a test at Las Vegas was to place a bulkhead at each end of the 3,000 ft. section not encased in concrete, and after filling it with water install a pressure pump at one end of the line and increase the pressure in the pipe until It failed. This is the only fair test which can be made of the line. Yours truly, am/h Engineer M of W m