Information
Digital ID
upr000334-034
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.m m I | R l Loe Angeles, IIov.l6th? 1917 File 613 Errors in force report. Extra work Las Vegas Pipenline. %. .. i&g. Mr. 0. 3. Drew:- Referring to your foroe report for week ending ]Jov.3rd, report 11, sheet 1 of 2/sheets, for repair work on Las Vegas Pipe Line. I note we are charged with one nan on the 30th of Uov. l/S day at $3/50 pisfr day, also one nan at $3.85 A 1/2 day; whereas oontract6r* s hill only charges us with one-fourth day each at $3.50 and © 2«5 respectively. */tC . Please investigate, adftising vfhich ofA two lit correct. k * Chief Engineer