Skip to main content

Search the Special Collections and Archives Portal

upr000334 4

Image

File
Download upr000334-004.tif (image/tiff; 26.15 MB)

Information

Digital ID

upr000334-004
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    COPY S t f f Los Angeles & Salt Lake R. R* Dr, 6553 Sunset Bl’vd. Los Angeles, Calif. Oct. 1-1917 To Chas. A. Poulson To money expended for labor and materials in work on the Las Vegas 16” Vit Pipe Water Line, from Aug.19th to Sept. 30th,inc. E. A. McCombs Foreman 35 days 5.00 - ---- - 175.00 0. Wells Laborer 20 " 3.25 - Inside of pipe 10 ------ 65.00 " 4.00 - ------ 40.00 Manuel Venegas Laborer 17.5 3.25 - ------ 56.85 ” Inside of pipe 15.5 ” 4.00 - ------ 62.00 G. Ramirez Laborer 5 ”/ 3.25 - ------ 16.25 F. Grajada T? 7 ” 3.25 - ---- - 22.75 Lewis Gradies If 14.25 I 3.25 - - - - - 45^40 M.L.Mora ft 12/75 " 3.25 - ------- 41.40 Joe Allegrea If f * 3.25 - ------ 22.75 B. Garcia ft 3.25 - ------ 29.25 H. Bermudes tf ii " 3.25 - r ---- 35.75 A. Hernandez ft / 7.25” 3.25 - ------ 23.55 S. J. James ” in pipe 10 ” 4.00 - ------ 40.00 675.95 1 B ill Accident Insurance rate ^?3.65 per $100 24.-50' B i Other expenses Drayage - - - — — - - - — _ — - 1.00 Chalk - — - - - - - - - - - - - - — .20 Paid boy for going through pipe"with rope .25 Rope - - - - - — ---- -- - - - - - - - 1.35 Finger stalls - - - - - - - - - - - - - .50 Leather gloves for cementing - - - - - 1.00 Rubber glebes - - - - - - - - - - - - — 1,00 Goggles to protect eyes while chipping 1.00 Brush - - - - - - - - - - — - - - - - - .35 2 pointer trowels - - - - - - - - - - - .70 Electric wire.globes,etc. (see hillf - - 8.50 2 sacks hydrated lime - - — 2.10 6vsacks cement from my stock - - - - - - 2.10 4 special hammers - - - - - - - ----- - - 2 . 0 0 1 hank saeh cord - - - - - - - - - - - - 1.25 Special chisels and gads - - - - - - - - 3.00 7^r65 - J W i & 79^-40 Plus 10$