Skip to main content

Search the Special Collections and Archives Portal

upr000332 154

Image

File
Download upr000332-154.tif (image/tiff; 25.79 MB)

Information

Digital ID

upr000332-154
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Estimates Line, Las Vegarsa,t eSr evJuapdpal.y Pipe June 5th. 1913. 610* Mr* B. C* Butt, General .Manager, Building* Dear Sir:- Some time ago I was asked by rir. Clark to procure a tender from the Reinforced Concrete ipe/Corapany for the construction and laying of an 10 inch guaranteed Reinforced concrete pipe between the Las Vegas springs and the steel tank at Las Vegas roundhouse to replace the existing 18 inch sh^pt steel pipe between those points, which latter pipe is so badly corroded by salts in the soil in which it is laid that it le no longer to be depended upon* I enclose you two copies of the offer of the Concrete Pipe Company. You will not© that it offers to furnish and lay an 18 inch pipe for $1.90 a foot,including payment of commercial rates for freight charges ovor this Company’s line between Los Angeles and Las Vegas; or for #1*35 a foot if no charge is made for freight over Company lines* 'This Company to pay for digging the trench in which the pipe will be laid,and for backfilling over the pipe. She Concrete Pipe Company guarantees the pipe for five years,as asked for by Mr* Clark. It is to be expected that the life of the pipe will far exceed that period, however, as analyses made by the Concrete Pipe Company of samples of the soil taken at frequent