Information
Digital ID
upr000332-096
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Freight on above at | .40 per loo lbs. L. A. to boa Yogas 11068.00 Total $181X0.00 C0HCR5T3 PIPE; Hotel In mazing this pipe, manufacturer w ill grade It to with stand heads given below. L im B. m 2s f t . 14* 0 to 26 f t . iioad at | .67 I 1757.00 Lino A. 9210 f t . 18* to 91 f t . head at | .92 | 8473.00 Freight on forms and reinforcing L.A. to Los ?©gas at Flat 816.00 freaching and B ack fillin g 12s cover over pipe 3345 yds. at | 0.20 049.00 m m r m All of the above-prices or, pip© include laying. In addition to the pip© lines there w ill be the oxpenao of dating Bpring b. and building a Pane© around it. To furnish and construct dam of type shown on drawing: 15 shoot piles 15 ft , long in place at $15,00 | 225.00 Board fence, barbed wire top 75* by as8, 7* high at $' .70psr lineal foot# 140.00 3 gates on pip© line at tsoo.oo | aoo.oo § 1266.00 ( 3 . )