Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
X Work Order there was added to the plant of the Railroad Company, facilities having a recorded cost of |344.333.35, which are listed in detail as follows: • A Description Recorded Amount 354’ of 24” transite pipe $ 11;290.07 1 6 6 ’ of 13” transite pipe 1; 513.09 2 1 9 ’ of 1 4 " transite 944* of 12” transite ppiippee 1,330.73 16’ of 36” C.I. pipe (S.K.) 3,534.02 10,697* of 24” C.I. pipe 153,'933639..3556 35544T *. oof f 116”2 ” C.C . I.I . pippiepe (S.H.) '335.74 94* of 3” C* I. pipe 5,067.31 377.32 3 6 ’ of 6” C. I. pipe '305.51 $371*9 ! ofo f 142"” mC. mI . pippiepe 1,524525..3407 17030’ ’ ofo f 26!? ” W.V . I.C .'ppiipepe 250.00 1 - Drilled well, 16:? casing 16;•349266..1374 11 -- CCoonnccrreettee rseestetrlvionigr basin 97;571.47 1 - Pump house 192;,139576..1797 11 -- VSaelt veo f boaxnchor blocks '300.00 974* of Cyclone fencing 21;,363459..4353 Pumping equipment 10,136.73 12 5 - - WoCo.Id. vavlavlvee bobxoexses 16570..3040 H6 os-e Firreee lsH ydarnad ntnsozzles 671.23 Power line - poles 1;'432310..9425 Power line - wire, etc. 11,066.34 TOTAL - RECORDED COST #344,333.35 All of these costs were not recorded in the books of the Railroad Company during the year 1946, but $261,402.90 of such costs were recorded and would have been shown in detail in the evidence at the hearing in this case had there been any intimation on the part of the Commission or any other party that the Investment Cost figures introduced by the Railroad Company were -31-