Skip to main content

Search the Special Collections and Archives Portal

upr000280 172

Image

File
Download upr000280-172.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000280-172
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Exhibit Witness Work Order No. 1+712 1+728 1+789 UNION PACIFIC RAILROAD COMPANY Summary of Capital Additions to Water Production Facilities at Las Vegas? Nevada, Authorized by Work Orders Expenditure Estimated Made Expenditure Description of Pro.iect Year 1951 Year 1952 Construct 6k feet of water pipe line, consisting of 16 feet of 12 inch and 1+8 feet of 8 inch cast iron pipe, from railroad 2k inch reservoir main to north line of Charleston Blvd. to connect to Las Vegas Land & Water Co. 8 inch cast iron main 2 075.80 Install pump and motor on wells Nos. 8, lO and 11; extend power circuit and rearrange existing piping connections 18 652.06 1 622.23 Cr, Construct booster pumping station including two pumps and 21+00 feet of ll+ inch transite water pipe line to connect with Las Vegas Land & Water Company’s proposed pipe line in Bonanza Road, to serve xrest side district 3*+. 297.10 _______ Total 55 021+.96 1 622,23 Cr