Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
V Exhibit No.__ Page No.___ 1 Witness LOS ANGELES & SALT LAKE RAILROAD COMPANY UNION PACIFIC RAILROA.D COMPANY, Lessee Detail of Capital Expenditures for Facilities Constructed other than those Mentioned* in Affidavits of Completion Filed with the State Engineer and which were Constructed Subsequent to January 1, 1931 and which are in Place as of December 31, 1951. Work Order Number Description of Project r 684 Fencing 26 ft 12 Transite pipe 977 ft 2/+" Transite pipe 3607 ft 16" Transite pipe ) 39 ft 16" Cast Iron pipeT" 85 ft 24" C^st Iron pipe 15 ft 12" Cast Iron pipe Credits netted on Betterment Accounting for property released 45.94 6 0 0 1.4 0 * 11 766.01 235.98 _ __ 24.99 1402 Valve and Meter boxes 7567 ft - 16" Cast Iron pipe Credits netted on Betterment Accounting for property released 1537 1 - Derrick and Concrete foundation 1 - Spring house 1 - Set pumping equipm'-nt 1 - Set poles'and power lines 661 ft - 8" Cast Iron pipe’ 1 350.62 195 ft - 6" Cast Iron pipe ____ 292.20 1815 2 - Derricks on foundation 2 - Deep well pumps Poles and power lints 954 ft - 2 4 " welded cleel ytpe Credits netted on Betterment Accounting for property reloaded 2013 1 - Derrick on foundation 4 - Weir boxes 1 - Floor in pumphouse 1 - (8,000 gal) water t"r..l: 1 - Pumping equipment 1 - Fire protection equipment 3304 ft - 20" Transite pipe 26 761.83 687 ft - 18" Transite pipe. 5 16-2.12 12 ft - 3 6 " SH cast iron pipe 118.07 6 ft - 14" Cast Iron pipe 14*79 6 ft - 12" Cast Iron pipe 12.85 Am*ount 295.57 17 813.35 260.97 8 069.52 Cr 203.40 20 407.92 12 101.78 550.30 2 026.29 477.70 295.97 1 642.82 1 101.69 6 027.92 7 571.53 3 858.42 2 700.00 ;:i 540.96 452.41 508.51 510.65 1 1 264.73 4 2 0 .1 2 _J2 069.66 Total 10 300.37 $ ' 509.54 4 993.08 15 859.56 46 767.64