Skip to main content

Search the Special Collections and Archives Portal

upr000279 210

Image

File
Download upr000279-210.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000279-210
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    C O N S U L T I N G E N C ? NE ELEVEN SUTTER S A N F R A N C I S C O 4 , C R ? Y A . WE Mr, R. E , Bennett Fromi Hr. Roy A* Wehe Subject? Supplemental Report ITL&WOo fo r Rat© Hearlag T h is memorandum w ill, confirm my understanding as to the work to b© don© in preparation fo r the coming bearing, which is now set fo r A p r il 3rd and 4th in la s Togas, fo r increase in water rates o f LV LM Q o, T h is matter w ill be developed under the follow * la g headings! 1 w Preparation of Supplemental E x h ib it, I t is proposed to prepare a supplemental report in summary form to that prepared under date of low, 16, I960, th is w ill give re su lts of operation fo r the recorded year I960 w ith an estim ate fee* the current year 1951* xt w ill be prepared on the same general' b a sis, using the three bases o f Investment, O rig in a l dost' and Present-day dost,. the summary fig u re s t i l l be supported w ith b rie f statements covering fix e d c a p ita l, revenue and expenses, I?he discussion and text w ill be kept to the minimum inasmuch as such d e ta il has already been pre* seated in the in it i a l rep o rt. Due to the fa c t that there may be some adjustments In the proposed rate t a r if fs which have been f ile d w ith the Commission, i t w ill probably be d esirable to pre­pare a supplemental t a r if f schedule se ttin g fo rth the current proposal as to the f la t rate to be charged. 8 * time Schedule to be Followed. Before the supplemental e x h ib it can be prepared, i t is necessary to secure certain basic m aterial from Omaha, Part o f the la tte r has been received, but the balance w ill probably not be a vaila b le before some time next week. PROGRAM MAR 7 1951