Skip to main content

Search the Special Collections and Archives Portal

upr000279 109

Image

File
Download upr000279-109.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000279-109
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    TABLE X ESTIMATED CAPITAL ADDITIONS YEAR 1951 PRODUCTION COMPANY; (L„A»& S.L.R.R.Co.) Pipe line to connect Westleigh Tract $ 2,110 Pumping station and pipe line to serve West Side District 40,540 Install pumps in Wells Nos. 8, 10 and 11 18,800 Install automatic electric starting and timing controls at booster stations and wells 4,000 Install telemeter equipment and circuits to record water level In reservoirs and pressures In L.V.L.& W,.Co. water mains 4,000 Total Estimated Net Capital Requirements $69,250