Skip to main content

Search the Special Collections and Archives Portal

upr000275 17

Image

File
Download upr000275-017.tif (image/tiff; 23.81 MB)

Information

Digital ID

upr000275-017
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Los Angeles, October 20, 1949 Mr* L* A« Barms, Asst* to General Manager of Properties. Omaha, Nebraska I Referring to our recent discussion while at Las Vegas, concerning accounting procedure used in connection with replacement of wood stave pipe lines pipe at Las Vegas: with cast iron raents in our files, which while Incomplete, indicate the accounting was handled on a betterment basis, the current cost of wood stave pipe replaced and labor being sharped to Operating Expenses. pxnuonient ox ©ooa i p . or wood stave pipe with cast iron at estimated cost of: Likewise , W, o* 416, approved. March, 1941, authorised replace-* ment of 27,270 ft* of wood stave and wrought iron pipe with cast iron pipe at estimated cost of: these authorisations, the 1940 and 1941 Carry-Over Statements would indicate the final accounting was substantially ns authorised. Further, in explanation of excessive cost of Maintenance during April and November, 1940, supplements at­tached to Form 7 for those months state the increases of wl4,0@4 and <§>10,233 wore due to expense of replacement of Review of various work orders and Auditor’s state Investment Expenses 5354 LF of New Cast Iron Pipe, Cost at current prices of i 3 640 # wood stave pipe retired. Labor 5 860 6 860 fir rs c n ? fo8r 798000' Investment Expenses 27,070 ft* of New Cast Iron Pipe, #35 950 # Labor Cost at current prices of wood stave and wrought iron r s TO5— f gg 700 While we have no record showing the accounting under