Information
Digital ID
upr000267-303
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Prelininary water Supply EgiytsitMetat f *or Lae Vegae and Vlolnlty * eontinned 6. 7- Power Linee «* 66 Kv. - 15 alias total 225*000* Telephone and oontrol lines • 88 «1. and equipment *2,000. Water Treatment Plant * g§ «gd. Uncovered Reservoir, to »g* 12*,000. Ttrieoantam e(nHtot Paleaenhta,n iBouaill)d ing and Building installs- 7^0*000. Machinery, controllers?, valves, fittings, etc* 216,000. aSeirrv ifciee lpdus suppep lyt o City MitillMiUon syatea and to Its,000* Switchgear, rack and transformers 120,000. 2Q-®illion gallon uncovered storage reservoir for treated water to be blended with raw water 100,000. | 6,219*000. Contingencies 10# 822,000. $ 9,0*1,000. OD.iHr.e ctC hearnggeisn,e eSruipnegr vainsdion and Engineering Fee — 5*1,000. Setlasted Total I 9.56**000.