Skip to main content

Search the Special Collections and Archives Portal

upr000267 174

Image

File
Download upr000267-174.tif (image/tiff; 23.37 MB)

Information

Digital ID

upr000267-174
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    MEMORANDUM FOR FILE WM. R. DEC 2 *949 Lob Angeles - Deo. 2, 19^9 • At Mr* Reinhardt*s request I prepared an estimate of cost of construction of a steel pipe water transmission line from Henderson to Las Vegas, as outlined In article In the Las Vegas Review-Journal of November 9 * 19^9 > which quoted from recent report prepared for the Las Vegas Water District by Greeley & Hansen, Ghloago Engineering firm. My estimate was prepared on the basis of the various lengths and sizes of line mentioned in the newspaper article. The description of the pipe lines, storage tanks, pumping facilities, etc*, and their location, was not clear, and in the circumstances I prepared the best estimate possible, as follows: kQ« Steel Pipe Line - Henodfe Prisotntm atno vicinity *4*5 Mi. $831,6- 0-0 kpw » » « Pittman to 6th & ? . Oakey, Las Vegas 10.*4- Mi. 2 ,196,4-80 In Las Vegas: 30" Steel Pipe Line - From 6th & Oakey northerly along Oakey to Stewart St., east to 9th, and west on Stewart to Main St. 2*2 Ml. 116,100 12" C.I. Pipe in Main St. from Stewart, St. to North Las Vegas 1*2 Mi* 50,760 $ 3 , 1 9 * 4 , 9 4 0 Add for valves, fittings, air relief valves, blow off valves, expansion Joints, anchorages, etc. 30,000 500,000 gallon elevated steel storage tank at 6th & Oakey Streets 66,000 100.000 gallon elevated steel storage tank . "somewhere in Las Vegas" ; 18*000 3.200.000 gallon oovered reservoir, Gunite bottom and sides, wooden roof, treated _ timber; earth out and fill 85,000 - $ 3 , 3 9 3 , 9 **o Does not include cost of: (a) Pumping station at Henderson — not mentioned in newspaper article.