Information
Digital ID
upr000265-085
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Cost of Producing Haw Water - Las Vegas, Nevada - 1940 Valuation: Right of way Housing over Big Spring and 12" RC Pipe 16" VC Pipe Line 16" Cl Pipe Line WO 1402 16" Cl Pipe Line 12" x 635' Well 24" and 16" Wood stave line Ventilators on spring house 12" Cl Pipe from little spring Meters 2,500,000 Gal. Reservoir 24" Cl Pipe Line 12" x 802’ Well & 12",16",24" pipe line 200 Acres and 2 Addl Wells 1940 WO 153? 235.35 3,837.80 3.850.21 20,507.99 5,197.95 6.109.22 8,267.34 125.44 6,010.25 3,236.54 65,856.64 61,555.11 19,877.57 30,458.95 1235,126.36 Physical changes during 1940 WO 1537 - Purchase 200 acres additional land and drill 2 additional wells and make miscl. improvements. Cost of producing water, 1940. Interest 6 per-cent of #235,126.36 14,107.58 Reserve 4 per-cent of 235,126.36 9,405.05 ^Insurance - Estimated 40.00 Taxes - Estimated 4,200.00 Repairs - Labor 104.0? Repairs - Material Estimated 100.00 Supplies - Estimated Recondition Well No. 2 and clean 10.00 middle spring 5,868.02 #33,834.72 L.V.L.& W.Co's proportion 83.65$ #28,302.74 Railroad Co’s proportion 16.35$ 5,531.98