Skip to main content

Search the Special Collections and Archives Portal

upr000264 218

Image

File
Download upr000264-218.tif (image/tiff; 33.46 MB)

Information

Digital ID

upr000264-218
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    DESCRIPTION OF PROPOSED WORKS * ____ Water t o be d iv e rte d by a d r i l l e d w e ll, empounded In a------------- State manner in which water is to be diverted, whether by aam or other works, whether through pipes, ditches, flumes, or other conduits. I f water ____ r e s e r v o ir o f ?3 »S50 S a le , capacit y and d is t r ib u t e d by a ------- is to be stored in reservoirs, it should be so stated and the location o it h e reservoir should be given with reference to the legal subdivisions. ____ system o f d itc h e r,------------------------------------------------------------------------------- 5. Estimated cost of works $12,000-00------------------- 6. Estimated time required to construct works— 6 Months 7 7. Remarks________________________________________________ F or use o f applicant This sheet inspected. , Engineer. OF STATE ENGINEER This is to certify that I have examined the foregoing application, and do hereby grant the same, subject to the following limitations and conditions: The amount of water to be appropriated shall be limited to the amount which can be applied to beneficial use, and not to exceed--------------- cubic feet per second. Actual construction work shall begin on or before---------------------- — Proof of commencement of work shall be filed before---------------------- Work must be prosecuted with reasonable diligence and be completed on or before_____ ______ )-------- ----------- Proof of completion of work shall be filed before------------------------ Application of water to beneficial use shall be made on or before------- _____________ ________. Proof of the application of water to beneficial use must be filed with State Engineer on or before----------------------- WITNESS MY HAND AND SEAL this_________ day of----------:------ , ------- State Engineer.