Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
DESCRIPTION OF PROPOSED WORKS * ____ Water t o be d iv e rte d by a d r i l l e d w e ll, empounded In a------------- State manner in which water is to be diverted, whether by aam or other works, whether through pipes, ditches, flumes, or other conduits. I f water ____ r e s e r v o ir o f ?3 »S50 S a le , capacit y and d is t r ib u t e d by a ------- is to be stored in reservoirs, it should be so stated and the location o it h e reservoir should be given with reference to the legal subdivisions. ____ system o f d itc h e r,------------------------------------------------------------------------------- 5. Estimated cost of works $12,000-00------------------- 6. Estimated time required to construct works— 6 Months 7 7. Remarks________________________________________________ F or use o f applicant This sheet inspected. , Engineer. OF STATE ENGINEER This is to certify that I have examined the foregoing application, and do hereby grant the same, subject to the following limitations and conditions: The amount of water to be appropriated shall be limited to the amount which can be applied to beneficial use, and not to exceed--------------- cubic feet per second. Actual construction work shall begin on or before---------------------- — Proof of commencement of work shall be filed before---------------------- Work must be prosecuted with reasonable diligence and be completed on or before_____ ______ )-------- ----------- Proof of completion of work shall be filed before------------------------ Application of water to beneficial use shall be made on or before------- _____________ ________. Proof of the application of water to beneficial use must be filed with State Engineer on or before----------------------- WITNESS MY HAND AND SEAL this_________ day of----------:------ , ------- State Engineer.