Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
^ DESCRIPTION OF PROPOSED WORKS —----Water to be d iv erted bv a d r ille d w e ll, empniinded in a r e s e rv o ir o f State manner in which water is to be diverted, whether by dam or other works, whether through pipes, ditches, flumes, or other conduits. I f water ______73»opO gals* cap acity and d istrib u ted by a system of d itch es. is to be stored in reservoirs, it should be so stated and the location o f the reservoir should be given with reference to the legal subdivisions. 5. Estimated cost of works__________ &12 .000.00__________ 6 . Estimated time required to construct works_____ months 7. Remarks__________ " _______ _____________________ For use o f applicant Las Vegas Land and Water Co. Compared__ HO-AT_____ This sheet inspected Applicant. By.________ A. M. F o l g e r General Manager , Engineer. . APPROVAL________ OF STATE ENGINEER This is to certify that I have examined the foregoing application, and do hereby grant the same, subject t,o the following limitations and conditions: , _____ This p -rmit is issued subject to a l l e x is tin g r ig h ts on the source. A valve must be in s ta lle d and maintained to prevent waste of., water.and accurate measurements o f water placed to b e n e fic ia l use must be taken from time to tim e. This source is located w ithin an area that has heen d e s i g n a t e d by t h e S t a t e E n g i n e e r a s comin g w i t h i n t h e meaning; o f the provision s o f the 1939 Underground Water Act as amended in 1943: th ere fo re the State has the righ t to regu late the use o f the water herein granted at any and a l l times. This permit is issued with the f u r t h e r p r o v i s i o n th at no p e r f o r a t i o n s he placed i n t h e oa si n-g a b o v e the 400 fo o t depth. The amount of water to be appropriated shall be limited to the amount which can be applied to beneficial use, and not to e x c e e d 4 . 0 ________ cubic feet per second. Actual construction work shall begin on or b e f o r e A p ril 8, 1949_____ Proof of commencement of work shall be filed b e f o r e May 8. 1949________ Work must be prosecuted with reasonable diligence and be completed on or before____ A p ril 8 , 1 9 5 0 ____________ Proof of completion of work shall be filed b e f o r e May 8» 1950 ______ Application of water to beneficial use shall be made on or before______ . ---------A p ril 8, 1952-- . Proof of the application of water to beneficial use must be filed with State Engineer on. or before_ May 8, 1952 Map filed May 20, 1948 WITNESS MY HAND AND SEAL this 29th day of September 1948. , / State Engineer. L