Skip to main content

Search the Special Collections and Archives Portal

upr000264 180

Image

File
Download upr000264-180.tif (image/tiff; 34.36 MB)

Information

Digital ID

upr000264-180
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    DESCRIPTION OF PROPOSED WORKS Water to be d iv e rte d by a d r i lle d w e l l , empounded in a r e s e rv o ir of State maimer in which water is to be diverted, whether by dam or other works, whether through pipes, ditches, flumes, or other conduits. I f water 73>850 g a ls , c ap a city and d is t rib u te d by a system of d itc h e s. is to be stored in reservoirs, it should be so stated and the location of the reservoir should be given with reference to the legal subdivisions. 5. 6 . Estimated cost of works. $12.000.00 Estimated time required to construct wor,k s______6_ __m_o-nths 7. Remarks_______________________________________ For use of applicant Las Vegas Land and Water Go.________| Applicant. By________A. M. ffo lger G eneral Manager C ompar e d HO-AT ____________________ This sheet inspected^.______________________ ________ ______ §1_______? ? ?__________________ , Engineer. APPROVAL________ OF STATE ENGINEER This is to c e r t ify that I have examined the foregoing a p p lication , and do hereby grant the same, subject to the fo llo w in g lim itatio n s and _c_o_n_d__it_i_o_n_s_:___This permit is issued subject to all existing rlghts on the source. A valve must be installed and maintained to prevent waste of water and accurate measurements of water placed to beneficial use must be taken from time to time. This source is located within an area that has boon dft.qigrnated by the State Engineer as coming within the meaning o f the p rovision s o f the 1939 Underground Water Act as amended im 1943; t h e r e f o r e t h e S t a t e has the rig h t to regu late the use o f the water------ herein granted at any and all times. This permit is issued with the " ' ’ v i s i o n that no p e r f o r a t i o n s be placed in the casing above__ o f dw£t©r to be appropriated s h a ll be lim ited to the amount which can be applied to b e n e fic ia l use, and not to exceed------- 4»_Q-------------- cubic fe e t per second. Actual construction work s h a ll begin on or before------ April ,p,,.,1949------- Proof of commencement of work s h a ll be f i l e d before.__May ft, 1949------------- hee 4am00o ufnoto Work must be prosecuted with reasonable d iligen ce and be completed on or h f t f n r f i April 8 t 1950_______________ Proof of completion of work s h a ll be f i l e d before------ May 8 , 19^0------------ Application of water to b e n e fic ia l use s h a ll be made on or before------------ _______ A p r il 8, 1952 Proof of the ap p lication of water to b e n e fic ia l use must be f i l e d with State Engineer on or before____ May ° 1—4952------------ Map f i l e d May 20, 194-8 WITNESS MY HAND AND SEAL th is 29t h___day of September , 1948. State Engineer.