Information
Digital ID
upr000261-046
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.CC - Mr. J. D. Ellis - Los Angeles Las Vegas, Nev. Dec, 7, 1954 L v v Re concrete pipe line and concrete conduit which the Fisher Contracting Co. is installing under our tracks for sthe «±t|p Under the terms of the agreement they were to construct a trestle under the set-out track for installation of .the first few feet of pipe thereby taking the set-out track oit of service temporarily and jack the pipe under the remaining tracks. // flaM It now develops that instead they wish to .lack the pipe under all of the tracks and thereby not disturbing the operation of the set-out track. flee II /Dwfeton Engift I DEC 8 195 \\ UU. *M ALNG RE.L AC \ CALtF I see no objection to this procedure whatsoever and therefore I have given them permission to perform their work accordingly G, eer