Skip to main content

Search the Special Collections and Archives Portal

upr000260 107

Image

File
Download upr000260-107.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000260-107
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

JAMES M. M O N T G O M E R Y C O N S U L T I N G E N G I N E E R 15 N O R T H O A K L A N D A V E N U E P A S A D E N A 1, C A L I F O R N I A FYa n -T’s? S S » - SYCAMORE 3-7129 February 9) 1955 Mr. R. L. Adamson Industrial Engineer Union Pacific Railroad Company k-22 West Sixth Street Los Angeles l4, California Subject: Las Vegas Valley Water District Dear Mr. Adamson: As you know, some right-of-way difficulties were encountered in connection with construction of the Worth Las Vegas Feeder just west of Main Street. Due to these difficulties, it will be necessary to-use a slightly different alignment than was shown originally. The new alignment is shown on Sheet H-2 Revision 4, two copies of which are enclosed herewith. We have also revised the pipeline grade where it crosses the railroad tracks to con­form to the Union Pacific standards. Enclosed also are two copies of the legal description for the easement across the Union Pacific right-of-way. Inasmuch as the Contractor has. his equipment on the job and is waiting for right-of-way clearance, we would appreciate it if you would give informal, approval pending preparation and execution of the formal easement. Very truly yours JAMES M. MONTGOMERY RCK:rw Enclosure cc: Mr. W. C. Renshaw Mr. H. L. Jones