Skip to main content

Search the Special Collections and Archives Portal

upr000258 282

Image

File
Download upr000258-282.tif (image/tiff; 63.18 MB)

Information

Digital ID

upr000258-282
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    m tank and booster pum ping station w ill be installed; several new water transm ission mains ranging in size from 15 inches to 39 inches; and a system of 8-inch, 12-inch and 14-inch loops within the existing system to strengthen the distribution system and to provide im proved fire protection. 3. U nder the contract w ith Basic M anagem ent, Inc., the W ater D istrict m ay w ithdraw 5 m illion gallons daily from the Lake M ead line. W h en the D istrict constructs certain im provem ents in capacity, 13)4 rag'd m ay be taken. T h e im provem ents to the existing supply system include the installation o f new pum ping equipm ent at the Lake M ead intake. T w o new pum ping stations will be constructed, one at the take-off point near M anganese, Inc. (3 miles northeast of H enderson), and one at a point about halfw ay betw een H enderson and Las V egas. T h e construction o f the boostin g station near M anganese, Inc. w ill reduce the present static head on the existing 40-inch line, thereby providing additional b oostin g capacity at the existing pum ping station located 2)4 miles northw est o f the Lake M ead intake. T h e D istrict plans to make these im provem ents to the Lake M ead supply system as soon as possible. T h e existing w ater intake facilities consist of six seven-stage deep w ell turbine pum ps with 182-foot colum ns suspended into deep w ater from a steel cantilever structure located on Saddle Island in Lake Mead. These pum ps have a capacity o f approxim ately 30 m gd, and they boost water 2% miles to an existing reservoir at an elevation o f 1400 feet. T h e lake surface m ay vary in elevation from 1229 to 1050 feet, causing the static head on the pum p to range between 171 and 350 feet. It is proposed to replace the existing intake pum ps with equipment of increased capacity in order to provide a total pum ping capacity of at least 43)4 m gd. T h e existing pum ps to be rem oved from the water intake facilities will be m odified and installed in the new pum ping station to be constructed at the Las V egas take-off near M anganese, Inc. T hese pum ps w ill then boost water on to H enderson through the existing 40-inch pipeline. Additional electrical facilities will be required to take care of the increased pum ping load. T h e Colorado R iver Com m ission has agreed to obtain pow er for the D istrict for pum ping from Lake M ead at the best available rate. P ow er for the booster station northw est o f W h itn ey will be purchased from the Southern N evada P ow er Com pany. T h e existing booster station presently has six pumps w ith a capacity o f about 30 m gd when five pumps are operating and boosts water to the H enderson terminal reservoirs at an elevation o f 2035 feet, w ith a static head o f 635 feet. U nder the proposed arrangement the existing booster pumps will pum p w ater to a new 1)4 m illion gallon reservoir at the Las V egas take-off at 1784 feet elevation, a static head o f 384 feet, and will provide about 50 m gd with all pum ps operating against the low er head. T he new booster station at Las V egas take-off near M anganese, Inc. will have a capacity o f 30 m gd with five pum ps operating. This station^ w ill be used to pum p w ater from the proposed 1/4 m g reservoir into the existing 30 m g terminal reservoirs at H enderson. T h e new 1)4 m g reservoir also w ill be used as a supply reservoir for water that w ill flow by gravity through a new 36-inch pipeline to the final b oostin g station located northw est o f W hitney. This final station (elevation 1750 feet) will pum p water through a 30-inch pipeline to Las V egas. • W h en the rate of water consum ption exceeds the com bined capacities o f the wells and the Lake M ead supply line, it will be necessary to install an additional line to Lake Mead. T he M ontgom ery report states, how ever, that the present local supply can be augm ented considerably by m ore effective use. T h e drilling o f a number o f new wells is recom m ended, and seasonable adjustm ents in the proportion of Lake M ead to local water used in order to reduce losses from the underground storage. It is estimated that the loss from underground storage due to upward leakage, deep-rooted plants, and evaporation is from 1,600 to 2,600 m illion gallons per year, and that a large part o f this loss m ay be eliminated by the m ore flexible operation possible w ith the Lake M ead supply. T he total potential daily supply should average about 38 m illion gallons a day. M ontgom ery estimates present average daily consum ption to be about 370 gallons per. capita. H ence the supply will support a population in excess o f 100,000 at present consum ption rates. This population is reached in 1990, the term o f the present bond issue, in the projections o f population made by M ontgom ery. If the population grow s m ore rapidly than the projected amounts, the w ater supply m ight be made to serve a larger population' than that indicated by present averages, if the high daily per capita consum ption could be reduced correspondingly. In Phoenix and T u cson , which are largely metered, the production in gallons per capita per day in 1950 was 211 and 153, 9 M respectively. It w ould therefore appear probable that public education in w ater conservation and som e general regulation and inspection w ould reduce the present consum ption rate by a consider­able am ount w ith a consequent increase in the period over w hich the supply w ill remain adequate. T h e costs o f the project are estim ated b y James M . M ontgom ery as fo llo w s : Estim ated Cost o f Proposed Im provem ents 30-million gallon reservoir in W est Las V eg a s.................................................................. $ 710,000 1/4-m illion gallon reservoir at M anganese O res................................................................ 85,000 Control building at M anganese O res.................................................................. ................... 53,500 B ooster pum ping station on U . S. H igh w ay 95.............................................. ................... 197,000 Pipeline from M anganese Ores to 30-million gallon reservoir.................. ............ ;... 1,661,500 Pipeline from Frem ont Street to 30-m illion gallon reservoir via Charleston Boulevard....................... ........................................................ ........ ........ ....... 292,000 M iscellaneous im provem ents to production facilities....................................................... 133,000 N ew w ater w ells........................ ....................... .......................... ......................... ................. . 68,000 Im provem ents to increase capacity o f 40rinch pipeline from Lake M ead to H enderson.......................................... ................................................. 620,000 M iscellaneous additional transmission pipelines.................................................................. 555,000 M iscellaneous additional im provem ents to distribution system .................................... 632,000# T otal Estim ated Construction Cost............ ............ ........................................... $5,007,000 Contingencies ........................................... .............................................. ...................................... 262,000 Purchase of existing water system from U nion Pacific R ailroad................................ 2,500,000* A cquisition o f sites, rights-of-w ay, easements, etc........................................................... 50,000 T otal A cquisition and Construction Costs.............. ...................................... $7,819,000 T otal incidental expenses, including return o f loans from County, w orking capital, engineering, legal and m iscellaneous.............................. 535,000 T otal Estim ated Cost o f P roposed Im provem ents...................................... $8,354,000 Cash reserve required to cover estim ated bond interest during construction and for six m onths thereafter............. ........ ............................... 346,000 T otal A m ount o f Proposed Bond Issue.......................................................... $8,700,000 # Meter installations, if made, can be paid from this sum. * Agreed purchase price; may be raised or lowered due to adjustments provided by contract. T he M ontgom ery engineering report estimates that the D istrict w ill sell water to the popula­tion inside the city of Las V egas plus an outside population equal to 10 per cent o f the Las V egas population. T he City o f N orth Las V egas has its ow n water system. It is expected that the City of N orth Las V egas m ay purchase som e water wholesale from the District. T he present N orth Las V egas supply is from wells. H enderson obtains its water from the existing Lake M ead pipeline, and Nellis A ir Force Base^has its ow n well supply. T h e unincorporated residential areas rely on wells, and it is anticipated that som e of the area near the pipelines will purchase water from the District. Reports o f the State Engineer of N evada indicate that 790 deep wells and som e 850 shallow wells have been drilled in the Las V egas Valley. T h e hotels and m otels o f the “ Strip” are large users of water and have their ow n wells, but som e have inadequate wells and are expected to purchase water from the District. Private pum ping is done under perm it by the State Engineer, w ho has the authority to regulate the use o f water and to prevent its waste. T he Enabling A ct of the N evada Legislature under w hich the Las V egas V alley W ater D istrict was form ed specifically provides that it is the intent o f the law to have all expenses, including bond interest and redem ption, paid from revenues. Consequently, although the bonds will be general obligations backed b y the full faith, credit and resources o f the District, the Board o f D irectors is under statutory obligation (so long as the rates are reasonable) to maintain water rates at a level that w ill provide sufficient revenue to meet maintenance and operation costs, bond interest and principal paym ents and all other charges, w ithout the necessity of a tax levy. 10